Browse by Contributors
Mahardika, Agustian Syahrizal (2024) EVALUASI RENCANA PENJADWALAN PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG LAB SCHOOL UNESA DENGAN METODE PERT. Undergraduate thesis, Universitas Muhammadiyah Malang.
Pratama, M. Djody Magenda (2024) PERENCANAAN PENJADWALAN PELAKSANAAN PADA PROYEK DITRESKRIMSUS POLDA JAWA TIMUR DENGAN MENGGUNAKAN METODE PERT. Undergraduate thesis, Universitas Muhammadiyah Malang.
Yanrosi, Alfrendi Firmansyah (2024) PENGARUH IMPLEMENTASI SISTEM MANAJEMEN KESEHATAN KESELAMATAN KERJA DAN LINGKUNGAN TERHADAP KINERJA DI PROYEK RUMAH SAKIT PARU JEMBER. Undergraduate thesis, Universitas Muhammadiyah Malang.
Akbar, Febry Noer (2024) ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING METODE KONVENSIONAL DENGAN METODE SISTEM PERI (Proyek Pembangunan Gedung Sekolah Gloria Grand Pakuwon Surabaya). Undergraduate thesis, Universitas Muhammadiyah Malang.
Haddad, M Nauval (2024) ANALISIS PERCEPATAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) PADA PROYEK PEMBANGUNAN GEDUNG STUDENT CENTER DAN AULA SBSN KAMPUS II UIN DATOKARAMA PALU. Undergraduate thesis, Universitas Muhammadiyah Malang.
Iswan, Wardania (2024) ANALISIS PERBANDINGAN EFISIENSI PRODUKTIVITAS TOWER CRANE STUDI KASUS : PEMBANGUNAN GEDUNG FAKULTAS KEDOKTERAN GIGI UNIVERSITAS BRAWIJAYA. Undergraduate thesis, Universitas Muhammadiyah Malang.
Husaini, Arkham Al (2024) EVALUASI PERENCANAAN WAKTU PADA PEMBANGUNAN GEDUNG LABOLATORIUM DAN PELAYANAN PUBLIK BALAI BESAR PENGAWAS OBAT DAN MAKANAN DENGAN MENGGUNAKAN METODE PERT ( Studi Kasus Proyek Pembangunan Gedung Labolatorium Dan pelayanan Publik Balai Besar Obat Dan Makanan Banjarmasin Kalimantan Selatan ). Undergraduate thesis, Universitas Muhammadiyah Malang.
Bichanan, Khamal Rouf (2024) ANALISIS TINGKAT PENERAPAN PEDOMAN SISTEM MENEJEMEN KESELAMATAN DAN KESEHATAN KERJA(SMK3) PADA PROYEK PEMBANGUNAN RSAU DR. M. MUNIR, LANUD ABDULRAHMAN SALEH KAB. MALANG. Undergraduate thesis, Universitas Muhammadiyah Malang.
Dewi, Liya Kusuma (2024) OPTIMALISASI BIAYA ALAT BERAT PADA PEKERJAAN CUT AND FILL PADA PROYEK PEMBANGUNAN JALAN LINTAS SELATAN LOT 6 KAB. TULUNGAGUNG (STUDI KASUS: STA 12+000 S.D STA 14+875). Undergraduate thesis, Universitas Muhammadiyah Malang.
Rahman, Aditya Fatur (2024) PENGARUH MANAJEMEN KESELAMATAN KESEHATAN KERJA DAN LINGKUNGAN TERHADAP PRODUKTIVITAS TENAGA KERJA PROYEK PEMBANGUNAN RUMAH SAKIT GRESIK SEHATI. Undergraduate thesis, Universitas Muhammadiyah Malang.
Majulu, Mohammad Fazril Aditya (2024) PENJADWALAN EFEKTIF PADA PROYEK PEMBANGUNAN RUMAH DINAS BUPATI BOLAANG MONGONDOW TIMUR TAHAP II DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO). Undergraduate thesis, Universitas Muhammadiyah Malang.
Syahriannur, Farhan (2023) PERENCANAAN BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN CUT AND FILL PROYEK JALUR LINTAS SELATAN LOT 7 KABUPATEN BLITAR STA 10+1000 s/d 12+625. Undergraduate thesis, Universitas Muhammadiyah Malang.
Alfariz, Muhammad Aldo (2023) EVALUASI PENJADWALAN DAN BIAYA PELAKSANAAN PROYEK REHABILITASI GEDUNG MENGGUNAKAN METODE PERT (Studi Kasus Pada Proyek Rehabilitasi Gedung Kejaksaan Tinggi Kalimantan Tengah). Undergraduate thesis, Universitas Muhammadiyah Malang.