ANALISA PERCEPATAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RAWAT INAP GDH DAN VASCULAR CENTER RSUD SIDOARJO

Milleno, Yafi'aldo Nicoshabirin Abhyasa Erdian Milleno (2025) ANALISA PERCEPATAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RAWAT INAP GDH DAN VASCULAR CENTER RSUD SIDOARJO. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf.pdf]
Preview
Text
PENDAHULUAN.pdf.pdf

Download (4MB) | Preview
[thumbnail of BAB I.pdf.pdf]
Preview
Text
BAB I.pdf.pdf

Download (56kB) | Preview
[thumbnail of BAB II.pdf.pdf]
Preview
Text
BAB II.pdf.pdf

Download (484kB) | Preview
[thumbnail of BAB III.pdf.pdf] Text
BAB III.pdf.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB IV.pdf.pdf] Text
BAB IV.pdf.pdf
Restricted to Registered users only

Download (363kB) | Request a copy
[thumbnail of BAB V.pdf.pdf] Text
BAB V.pdf.pdf
Restricted to Registered users only

Download (17kB) | Request a copy
[thumbnail of LAMPIRAN.pdf.pdf] Text
LAMPIRAN.pdf.pdf
Restricted to Registered users only

Download (22kB) | Request a copy

Abstract

Construction management is a system for regulating construction activities that involves various professional disciplines to achieve efficiency in cost, quality, and time. However, construction projects often experience delays due to discrepancies between planned schedules and actual field implementation. Factors contributing to delays include design changes, project conditions, weather, equipment and material shortages, and labor requirements. To address this issue, project duration acceleration methods such as fast track, crash program, and time-cost trade-off (TCTO) are required.

This study analyzes the acceleration of the construction project for the West GDH Inpatient Building and Vascular Center Sidoarjo, carried out by PT. Santo Jaya Etika Beton, with a project value of IDR 46,503,500,000.00. The Time-Cost Trade-Off method is applied using acceleration alternatives such as overtime work and additional labor. The objective of this analysis is to determine the maximum acceleration duration with minimal additional costs, ensuring the project is completed on time without causing losses to either the contractor or the owner

Item Type: Thesis (Undergraduate)
Student ID: 201810340311263
Keywords: Construction management, project acceleration, delays, Time-Cost Trade-Off, building construction
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201810340311263 yafialdonicoshabirin
Date Deposited: 21 Aug 2025 09:27
Last Modified: 21 Aug 2025 09:29
URI: https://eprints.umm.ac.id/id/eprint/23151