Anwar, Muhammad Nashrul (2025) EVALUASI PENJADWALAN PEKERJAAN JALAN UTAMA DAN DRAINASE WANGSA MSM-HPI DENGAN MENGGUNAKAN METODE PERT. Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (3MB) | Preview
BAB I.pdf
Download (772kB) | Preview
BAB II.pdf
Download (1MB) | Preview
BAB III.pdf
Download (1MB) | Preview
BAB IV.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (850kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (2MB) | Request a copy
Abstract
In the process of project implementation, there were several obstacles that occurred which resulted in the project implementation being delayed. The high intensity of rain in the early months of the construction project which caused the ground surface to be flooded and the limited availability of heavy equipment which also resulted in project delays were strong reasons why the project implementation was constrained. The PERT method is a probabilistic scheduling method, where the duration of each activity allows for delays and there is no certainty in accelerating the project completion schedule. This research method is a scheduling evaluation process using Probabilistic scheduling that considers the possibility of a project experiencing delays. This is what makes the author use the PERT method in the main road and drainage work project of the MSM-HPI dynasty. From the analysis of the PERT method, a td value of 21 weeks was obtained with a probability of 99.97%.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Student ID: | 201810340311243 |
| Keywords: | PERT, Scheduling Evaluation |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
| Depositing User: | 201810340311243 nasrulanwar23 |
| Date Deposited: | 30 May 2025 07:46 |
| Last Modified: | 30 May 2025 07:46 |
| URI: | https://eprints.umm.ac.id/id/eprint/18248 |
