PERENCANAAN DAN DESAIN SPBU DENGAN KONSEP REST AREA DI KECAMATAN BALIKPAPAN TIMUR

Fathonah, Eva and Rudianto, Ananda Akbar and Paath, Aldi Abdillah and Misdianto, Zahrah Zahiyah (2026) PERENCANAAN DAN DESAIN SPBU DENGAN KONSEP REST AREA DI KECAMATAN BALIKPAPAN TIMUR. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (4MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (404kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (574kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (666kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (368kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (11MB) | Request a copy
[thumbnail of BAB VI.pdf] Text
BAB VI.pdf
Restricted to Registered users only

Download (413kB) | Request a copy
[thumbnail of BAB VII.pdf] Text
BAB VII.pdf
Restricted to Registered users only

Download (384kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (5MB) | Request a copy
[thumbnail of POSTER.pdf] Text
POSTER.pdf
Restricted to Registered users only

Download (281kB) | Request a copy

Abstract

The development of the supporting area of the Nusantara Capital City (IKN) in East Balikpapan has increased traffic mobility and the demand for adequate fuel station facilities. The limited number of fuel stations and the absence of integrated rest areas may cause congestion and reduce user comfort. This study aims to design a fuel station integrated with a rest area concept that fulfills technical, safety, and environmental sustainability aspects. The planning process follows applicable standards and regulations, including upper and substructure design using the Load and Resistance Factor Design (LRFD) method, pavement, drainage, utilities, and site layout planning. Structural analysis was performed using modeling software to ensure safety against gravity and lateral loads. The design also includes 35 kL underground storage tanks per unit, fuel distribution systems, cost estimation (Bill of Quantities), and project scheduling using the Critical Path Method (CPM). The results indicate that the ±10,000 m² area meets technical and functional requirements. The total estimated cost is Rp16,317,743,302 with a project duration of 270 calendar days, indicating that the project is technically and economically feasible to support regional development in East Balikpapan.

Item Type: Thesis (Undergraduate)
Student ID: 202110340311176, 202110340311192, 202110340311197, 202110340311252
Keywords: Fuel Station, Rest Area, Structural Design
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 202110340311252 zahrahzm04
Date Deposited: 06 Mar 2026 04:07
Last Modified: 06 Mar 2026 04:07
URI: https://eprints.umm.ac.id/id/eprint/28435

Actions (login required)

View Item
View Item