Nasyihin, Muhammad Imdadun and Roshanda, Muh. Fasya Brilliant and Nugroho, Muhammad Dwi (2026) PERENCANAAN TEKNIS PEMBANGUNAN GEDUNG PUSAT SUMBER BELAJAR INSTITUT AGAMA ISLAM NEGERI (IAIN) PONOROGO. Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (902kB) | Preview
BAB 1.pdf
Download (167kB) | Preview
BAB II.pdf
Download (333kB) | Preview
BAB III.pdf
Restricted to Registered users only
Download (339kB) | Request a copy
BAB IV.pdf
Restricted to Registered users only
Download (2MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (9MB) | Request a copy
BAB VI.pdf
Restricted to Registered users only
Download (240kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (30MB) | Request a copy
POSTER.pdf
Restricted to Registered users only
Download (38MB) | Request a copy
Abstract
The Learning Resource Center Building of the State Islamic Institute (IAIN) Ponorogo is located on Jl. Puspita Jaya, Krajan, Pintu, Jenangan, Ponorogo, East Java. Based on the building function and site class, the planned building is classified under Risk Category IV located on a Hard Soil (SC) site and categorized into SDC C. The upper structure design is planned using a Special Moment Resisting Frame System (SMRFS). Based on the structural calculation and analysis results, the dimensions of the structural elements obtained include a floor slab thickness of 12 cm and a roof slab thickness of 12 cm with a reinforcement diameter of Ø10. For the dimensions of the transverse secondary beams of 25/50 cm and longitudinal secondary beams of 25/30 cm, main reinforcements of D22 and D14 are used, as well as Ø10 for shear reinforcement. The dimensions of the transverse and longitudinal primary beams are 35/70 cm with main reinforcements of D25 and D22, as well as Ø10 for shear reinforcement. The dimensions of the main columns are 75/75 cm with main reinforcements of D22 and Ø13 for shear reinforcement. The substructure design is planned using Bored Pile foundations with a diameter of 40 cm at a depth of 7 m. The total planned budget is Rp 45,917,928,276.- with a construction period of 1,283 days
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Student ID: | 202010340311004, 202010340311020, 202010340311045 |
| Keywords: | Reinforced Concrete, Foundation, Bored Pile, Bill of Quantities (BoQ) |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
| Depositing User: | 202010340311004 imdadnasihin |
| Date Deposited: | 20 Jun 2026 02:26 |
| Last Modified: | 20 Jun 2026 02:26 |
| URI: | https://eprints.umm.ac.id/id/eprint/30962 |
