Pambudi, Satrio Bagus (2024) PERENCANAAN SISTEM PLAMBING PADA GEDUNG RESEARCH CENTER UPN “VETERAN” JAWA TIMUR. Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (542kB) | Preview
BAB I.pdf
Download (164kB) | Preview
BAB II.pdf
Download (716kB) | Preview
BAB III.pdf
Restricted to Registered users only
Download (351kB) | Request a copy
BAB IV.pdf
Restricted to Registered users only
Download (2MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (105kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (5MB) | Request a copy
Abstract
The importance of the plumbing system in a building means that the plumbing system must also be planned by considering the various aspects needed. Plumbing systems in buildings Research Center UPN "Veteran" East Java will be discussed starting from planning the need for clean water discharge, the amount of waste water discharge, dimensions Ground Water Tank (GWT), Roof Top Water Tank (RTW), dimensions of clean water pipes to dimensions of dirty water pipes. With a total building area of 1008 m2 and 7 floors of this building require a daily clean water debit (Qh) of 10.5 m3/ hour, producing a discharge discharge of 67.2m3/day, capacity required GWT of 97.2 m3, RWT of 32 m3. The plumbing system in this building uses pipes with a diameter of 22mm - 48mm for clean water pipes, while for the main dirty water pipes a diameter of 165mm is used.
Item Type: | Thesis (Undergraduate) |
---|---|
Student ID: | 201710340311209 |
Keywords: | Plumbing; Ground Water Tank (GWT), Roof Top Water Tank (RWT); Debit; Pipes; Dimensions. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
Depositing User: | 201710340311209 satriobp |
Date Deposited: | 19 Aug 2024 03:39 |
Last Modified: | 19 Aug 2024 03:39 |
URI: | https://eprints.umm.ac.id/id/eprint/10596 |