EVALUASI PERENCANAAN WAKTU PADA PEMBANGUNAN GEDUNG LABOLATORIUM DAN PELAYANAN PUBLIK BALAI BESAR PENGAWAS OBAT DAN MAKANAN DENGAN MENGGUNAKAN METODE PERT ( Studi Kasus Proyek Pembangunan Gedung Labolatorium Dan pelayanan Publik Balai Besar Obat Dan Makanan Banjarmasin Kalimantan Selatan )

Husaini, Arkham Al (2024) EVALUASI PERENCANAAN WAKTU PADA PEMBANGUNAN GEDUNG LABOLATORIUM DAN PELAYANAN PUBLIK BALAI BESAR PENGAWAS OBAT DAN MAKANAN DENGAN MENGGUNAKAN METODE PERT ( Studi Kasus Proyek Pembangunan Gedung Labolatorium Dan pelayanan Publik Balai Besar Obat Dan Makanan Banjarmasin Kalimantan Selatan ). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (3MB) | Preview
[thumbnail of BAB I .pdf]
Preview
Text
BAB I .pdf

Download (195kB) | Preview
[thumbnail of BAB II .pdf]
Preview
Text
BAB II .pdf

Download (1MB) | Preview
[thumbnail of BAB III .pdf]
Preview
Text
BAB III .pdf

Download (367kB) | Preview
[thumbnail of BAB IV .pdf] Text
BAB IV .pdf
Restricted to Registered users only

Download (523kB) | Request a copy
[thumbnail of BAB V .pdf] Text
BAB V .pdf
Restricted to Registered users only

Download (174kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

A project is an activity that is temporary in nature, that is, the planned start and
finish points are clear. In projects, implementation problems often occur in the
form of delays in implementing the work itself. This is due to the lack of precise,
detailed and efficient management planning, which causes the implementation of
the project schedule to be less effective and the possibility of experiencing delays
in its implementation. Therefore, good project management is needed to analyze
the construction schedule and to improve the quality of project planning. The
PERT method is a planning method using job networks that are connected by
certain considerations. This method, like CPM (Critical Path Method), requires
several parameters, one of which is activity duration. PERT is basically a time�oriented method, in the sense that the PERT method will end by determining time
scheduling, scheduling by considering the duration of activities that are uncertain.
PERT assumes a probability density function of activity duration. With the Project
Evaluation and Review Technique (PERT) method, the parameters used are
standard deviation (S) and Variance (V) and then the 3S value so that a time target
is obtained that reaches a 99% percentage of project completion.

Item Type: Thesis (Undergraduate)
Student ID: 201710340311057
Keywords: Keywords: PERT method, time estimation
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201710340311057 arkhamalhusaini
Date Deposited: 07 Aug 2024 04:19
Last Modified: 07 Aug 2024 04:19
URI: https://eprints.umm.ac.id/id/eprint/9545

Actions (login required)

View Item
View Item