ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING METODE KONVENSIONAL DENGAN METODE SISTEM PERI (Proyek Pembangunan Gedung Sekolah Gloria Grand Pakuwon Surabaya)

Akbar, Febry Noer (2024) ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING METODE KONVENSIONAL DENGAN METODE SISTEM PERI (Proyek Pembangunan Gedung Sekolah Gloria Grand Pakuwon Surabaya). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (721kB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (184kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (478kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (203kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (105kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB) | Request a copy

Abstract

The development of construction technology in Indonesia, especially in the field of construction, is required to have good management or management so as to achieve the expected goals. Construction management regulates the balance between organizing, planning, implementing, and controlling resources to achieve efficient and effective construction project targets, especially in multi-storey buildings. This study aims to calculate the cost and time required for the implementation of beam, plate, and column work using conventional formwork methods and fairy system formwork methods. This research includes analyzing formwork implementation methods, analyzing material requirements, analyzing productivity and duration, and analyzing formwork costs. These two methods are used to obtain the following results: peri system formwork cost requires Rp. 3,692,480,458.90 and conventional formwork cost requires Rp. 3,348,111,509.84. The processing time for peri system formwork is 180 days, while conventional formwork takes 230 days.

Item Type: Thesis (Undergraduate)
Student ID: 201710340311174
Keywords: Formwork, Conventional method, peri system, cost and time
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201710340311174 febrynoerakbar
Date Deposited: 24 Jun 2024 01:34
Last Modified: 24 Jun 2024 01:34
URI: https://eprints.umm.ac.id/id/eprint/7396

Actions (login required)

View Item
View Item