PERENCANAAN DESAIN PERKERASAN KAKU (RIGID PAVEMENT) MENGGUNAKAN METODE BINA MARGA 2017 DAN AASHTO 1993 JALAN TOL SERPONG – BALARAJA SEKSI 1B STA 5+150 – STA 9+845

Irawan, Arif Budi (2024) PERENCANAAN DESAIN PERKERASAN KAKU (RIGID PAVEMENT) MENGGUNAKAN METODE BINA MARGA 2017 DAN AASHTO 1993 JALAN TOL SERPONG – BALARAJA SEKSI 1B STA 5+150 – STA 9+845. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (476kB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (183kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (705kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (282kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (613kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (97kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (308kB) | Request a copy

Abstract

This final assignment examines rigid pavement on toll roads. The purpose of this planning is to plan the pavement design and budget the costs that need to be incurred in toll road planning. So it is necessary to plan the pavement using the 2017 Bina Marga and AASHTO 1993 methods. The data required includes traffic volume data, rainfall data, technical data, soil data. After collecting all the data, planning is carried out using the 2017 Bina Marga and AASHTO methods. 1993 then ended with a RAB calculation that was in accordance with the thickness of the pavement planned for the Serpong – Balaraja toll road so that the design results using the 1993 AASHTO method produced a concrete slab thickness of 42 cm and a foundation layer of 10 cm, whereas in planning using the 2017 Bina Marga method the thickness was obtained. concrete slab around 30.5 cm, foundation layer (LC) 10 cm and foundation layer under class B aggregate 15 cm. Meanwhile, the cost budget plans obtained from each method have different results. For the 2017 Bina Marga rigid pavement method, the planned cost is IDR 73,721,843,085.0. Meanwhile, using the AASHTO 1993 method, the resulting cost plan is IDR 93,313,825,729. This cost budget plan has differences due to different rigid pavement thickness planning results.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311150
Keywords: Rigid Pavement Design Planning and Cost Budget Plan Using the 2017 Bina Marga Method and 1993 AASHTO Method.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311150 arifbudiirawan03
Date Deposited: 11 Jun 2024 06:35
Last Modified: 11 Jun 2024 06:35
URI: https://eprints.umm.ac.id/id/eprint/7010

Actions (login required)

View Item
View Item