Majulu, Mohammad Fazril Aditya (2024) PENJADWALAN EFEKTIF PADA PROYEK PEMBANGUNAN RUMAH DINAS BUPATI BOLAANG MONGONDOW TIMUR TAHAP II DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO). Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (3MB) | Preview
BAB I.pdf
Download (548kB) | Preview
BAB II.pdf
Download (911kB) | Preview
BAB III.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB IV.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (533kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (4MB) | Request a copy
Abstract
Implementation of the East Bolaang Mongondow Regent's Official Home Construction Project Phase II began on July 17 2023. This project is still classified as a project that has just started, but there was a delay in the initial progress of project implementation, resulting in a deviation of -1.48% and -1, 24% in the second and third weeks. Based on the identification of problems that occur, the causes of project delays are limitations and a lack of available workforce, resulting in progress not going according to plan. Therefore, it is necessary to carry out effective scheduling planning before the project experiences significant delays. The method used in this research is TCTO to carry out effective scheduling planning for projects, by adding overtime working hours. TCTO aims to speed up implementation time while still paying attention to increasing costs and analyzing the influence of activity time which can speed up the implementation duration. so that the maximum acceleration duration can be known with minimum costs. From the project schedule, it is known that the initial plan was for a duration of 150 days with a cost of IDR 3,035,000,000. However, if the project is accelerated using the TCTO method with the alternative of adding 2 hours of overtime work, the optimum cost result is IDR 3,082,354,670.60 with an optimum time of 132 days, while for the alternative of adding 4 hours of overtime work, the optimum cost result is IDR 3,162,833,417.79 with the optimum time. 129 days.
Item Type: | Thesis (Undergraduate) |
---|---|
Student ID: | 201810340311045 |
Keywords: | Time, Cost, TCTO |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
Depositing User: | 201810340311045 fazrilmajulu |
Date Deposited: | 12 Feb 2024 03:50 |
Last Modified: | 12 Feb 2024 03:51 |
URI: | https://eprints.umm.ac.id/id/eprint/3581 |