ANALISA LEAN MANUFACTURING DALAM PERENCANAAN STRATEGIS UNTUK MENINGKATKAN EFEKTIVITAS PRODUKSI PT. JAYA ETIKA BETON

Irfan, Fajril (2024) ANALISA LEAN MANUFACTURING DALAM PERENCANAAN STRATEGIS UNTUK MENINGKATKAN EFEKTIVITAS PRODUKSI PT. JAYA ETIKA BETON. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN_FAJRIL IRFAN_202010160311402.pdf]
Preview
Text
PENDAHULUAN_FAJRIL IRFAN_202010160311402.pdf

Download (1MB) | Preview
[thumbnail of BAB I_FAJRIL IRFAN_202010160311402.pdf]
Preview
Text
BAB I_FAJRIL IRFAN_202010160311402.pdf

Download (266kB) | Preview
[thumbnail of BAB II_FAJRIL IRFAN_202010160311402.pdf]
Preview
Text
BAB II_FAJRIL IRFAN_202010160311402.pdf

Download (534kB) | Preview
[thumbnail of BAB III_FAJRIL IRFAN_202010160311402.pdf] Text
BAB III_FAJRIL IRFAN_202010160311402.pdf
Restricted to Registered users only

Download (214kB) | Request a copy
[thumbnail of BAB IV_FAJRIL IRFAN_202010160311402.pdf] Text
BAB IV_FAJRIL IRFAN_202010160311402.pdf
Restricted to Registered users only

Download (512kB) | Request a copy
[thumbnail of BAB V_FAJRIL IRFAN_202010160311402.pdf] Text
BAB V_FAJRIL IRFAN_202010160311402.pdf
Restricted to Registered users only

Download (78kB) | Request a copy
[thumbnail of LAMPIRAN_FAJRIL IRFAN_202010160311402.pdf] Text
LAMPIRAN_FAJRIL IRFAN_202010160311402.pdf
Restricted to Registered users only

Download (568kB) | Request a copy

Abstract

PT. Jaya Etika Beton (General Contractor and Precast Concrete Supplier) is a manufacturing company that focuses on the construction field as a major provider of precast concrete. The problem that occurs is the existence of waste in the production process which hinders the efficiency of the company. This study was conducted to determine and analyze the existence of waste and its causes, and provide a strategic plan for recommendations for improving the production process. The methods used are value stream mapping (VSM), value stream analysis tools (VALSAT), and the 5 why's. This study found that the high wastage that occurred included transportation, waiting, unnecessary inventory, and motion with moderate levels. The proposed strategic plan for improvement recommendations is depicted on the future state value stream mapping. The results of the improvement recommendations given are the value of lead time which was originally 5.35 days to 2.03 days and the value added ratio increased from 3.18% to 8.37%.

Item Type: Thesis (Undergraduate)
Student ID: 202010160311402
Keywords: Lean Manufacturing, Value Stream Mapping (VSM), Value Stream Analysis Tools (VALSAT), 5 Why’s
Subjects: H Social Sciences > HC Economic History and Conditions
H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Economics and Business > Department of Management (61201)
Depositing User: 202010160311402 fajrilirfan17
Date Deposited: 01 Feb 2024 05:51
Last Modified: 01 Feb 2024 05:51
URI: https://eprints.umm.ac.id/id/eprint/3277

Actions (login required)

View Item
View Item