PENGADAAN SAFETY STOCK (SS) MATERIAL UNTUK MENINGKATKAN EFEKTIVITAS PRODUKSI PADA PT. JAYA ETIKA BETON

Azkiyyah, Mi'rojul (2024) PENGADAAN SAFETY STOCK (SS) MATERIAL UNTUK MENINGKATKAN EFEKTIVITAS PRODUKSI PADA PT. JAYA ETIKA BETON. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (2MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (152kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (218kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (130kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (341kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (69kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (439kB) | Request a copy

Abstract

Manufacturing companies must implement good inventory management to obtain an effectiveness production process. PT. Jaya Etika Beton is a manufacturing company that operates in precast concrete construction. This research aims to determine the number of safety stock and order points of each of the main materials used in the production process so that the process runs efficiently and does not occur. This research uses the method safety stock and order point. The research results show that companies need to implement safety stock for coral, sand, cement, and materials additive console respectively 396.52 Tons, 351.76 m3, 117.59 Tons, and 1,497.9 lt. Whereas for reorder point for coral material as much as 481.22 tons, 416.53 m3 for sand, 152.42 tons for cement material, and for additive console as much as 1,713, 87 lt. Suggestions were given to PT. Jaya Etika Beton is a company that can apply calculations of safety stock and reorder point on main material supplies. Application safety stock and reorder point allow companies to optimize and increase effectiveness in the production process. Thus, risk stockout during lead time can be minimized and the smooth production process maintained.

Item Type: Thesis (Undergraduate)
Student ID: 202010160311271
Keywords: PT. Jaya Etika Beton, inventory management, safety stock, reorder point
Subjects: H Social Sciences > HB Economic Theory
H Social Sciences > HC Economic History and Conditions
Divisions: Faculty of Economics and Business > Department of Management (61201)
Depositing User: 202010160311271 mirojulazkiyyah27
Date Deposited: 29 Jan 2024 01:19
Last Modified: 29 Jan 2024 01:19
URI: https://eprints.umm.ac.id/id/eprint/3084

Actions (login required)

View Item
View Item