OPTIMALISASI PERENCANAAN PENJADWALAN PRODUKSI BETON PADA PT JAYA ETIKA BETON

Lailaturrohmah, Wahyu Aisyah (2024) OPTIMALISASI PERENCANAAN PENJADWALAN PRODUKSI BETON PADA PT JAYA ETIKA BETON. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (259kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (382kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (379kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (660kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (173kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (294kB) | Request a copy

Abstract

Manufacturing companies contribute significantly to economic development because they are able to produce goods or services. The production scheduling system in the precast concrete manufacturing industry at PT Jaya Etika Beton is not regularly coordinated so that production scheduling is not optimal and there are mismatches in due dates which cause delays in the completion process or product delivery. This research aims to analyze production scheduling planning through sequencing method calculations (job priority rules) focused on improving the smooth flow of the production process, customer loyalty and satisfaction. The analysis method for this research is qualitative and quantitative using the sequencing method.
The research results show that the most recommended, effective and efficient method that can be used by PT Jaya Etika Beton is the SPT (Shortest Processing Time) method through the principle of prioritizing jobs with the shortest processing time to be completed. The SPT method produces a total time flow of 364 days, an average completion time of 18 weeks, an average delay of 10 days, an average of 7 jobs and an average utilization matrix of 13%. So, by implementing the SPT method, companies can meet customer expectations regarding the speed of the product delivery process.

Item Type: Thesis (Undergraduate)
Student ID: 202110160311133
Keywords: Production Scheduling, Sequencing, SPT (Shortest Processing Time)
Subjects: H Social Sciences > HB Economic Theory
Divisions: Faculty of Economics and Business > Department of Management (61201)
Depositing User: 202110160311133 heiisyahzzx
Date Deposited: 13 Jan 2025 05:51
Last Modified: 13 Jan 2025 05:51
URI: https://eprints.umm.ac.id/id/eprint/13499

Actions (login required)

View Item
View Item