EFEKTIVITAS TATA LETAK TOWER CRANE PADA PROYEK PEMBANGUNAN RSUD DR. SAIFUL ANWAR TERHADAP WAKTU DAN BIAYA

Magfiratun, Magfiratun (2024) EFEKTIVITAS TATA LETAK TOWER CRANE PADA PROYEK PEMBANGUNAN RSUD DR. SAIFUL ANWAR TERHADAP WAKTU DAN BIAYA. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (4MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (203kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (542kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (469kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (446kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (18MB) | Request a copy

Abstract

In construction projects, especially for high rise buildings, one of the facilities used is a tower crane. This tool is employed to transfer materials from one place to another both vertically and horizontally. Each use of a tower crane in a project incurs significant operational costs, so the planning contractor must analyze the factors that can influence cost overruns or operational hours. The Dr. Saiful Anwar regional general hospital project is one that utilizes a QTZ80(5810) hydraulic self-raising tower crane with a jib length of 60 meters during its construction. It was found that there were indications of cost overruns due to the ineffectiveness of the tower crane's placement and overtime operational costs exceeding the contracted hours. Consequently, a comparative analysis was conducted regarding the existing location, characteristics, capacity, height reach, and operational costs of the tower crane. Based on the analysis results, a time difference of 124.71 hours and a cost difference of IDR 130,351,145 were obtained.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311231
Keywords: Tower crane, cost analysis, time analiysis, highrise.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311231 iraaaaaaaa1763
Date Deposited: 04 Nov 2024 09:12
Last Modified: 04 Nov 2024 09:12
URI: https://eprints.umm.ac.id/id/eprint/12192

Actions (login required)

View Item
View Item