EVALUASI RENCANA WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN GEDUNG KDP ENTREPENEURSHIP TERPADU UNIVERSITAS BRAWIJAYA DENGAN MENGGUNAKAN METODE PERT

FIRDAUSI, MAHDAVIKIA (2024) EVALUASI RENCANA WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN GEDUNG KDP ENTREPENEURSHIP TERPADU UNIVERSITAS BRAWIJAYA DENGAN MENGGUNAKAN METODE PERT. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of Pendahuluan.pdf]
Preview
Text
Pendahuluan.pdf

Download (2MB) | Preview
[thumbnail of BAB 1.pdf]
Preview
Text
BAB 1.pdf

Download (548kB) | Preview
[thumbnail of BAB 2.pdf]
Preview
Text
BAB 2.pdf

Download (1MB) | Preview
[thumbnail of BAB 3.pdf]
Preview
Text
BAB 3.pdf

Download (1MB) | Preview
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Registered users only

Download (586kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (20MB) | Request a copy

Abstract

The objective of this research is to assess the time and cost implications of the project activities associated with the Integrated Entrepreneurship KDP Building Construction program at Brawijaya University Malang, situated on Jalan Veteran, Ketawanggede, Lowokwaru Kec, Malang, East Java. The PERT method is employed to ascertain the likelihood of meeting the project timeline as outlined in the schedule. It entails a detailed examination of the time and cost implications associated with the project, with a particular focus on identifying opportunities for acceleration along the critical path. In this study, the data utilized pertains to the construction of the Integrated Entrepreneurship KDP Building at Brawijaya University Malang. In order to mitigate the adverse effects of delays in project activities, a series of measures have been proposed to facilitate the crashing process. Crashing is conducted on activities that are on the critical path. The results of this study yielded 31 critical paths from 63 activities. The project was completed within the planned timeframe of 53 calendar weeks; however, there were delays in the actual completion of the project. Subsequent to the calculation of the critical path via the PERT method, the probability of project completion within a 47-week timeframe was determined to be 98%. Following the implementation of the crash program on three occasions and the incorporation of an additional two hours of work per day, the optimal duration was identified as 43 weeks, with a corresponding crash cost of Rp. The initial cost planned was Rp. 35,595,616,939, and the final result of this study is a reduction in the number of durations by 10 weeks with an additional final cost of Rp 36,476,092,888.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311215
Keywords: PERT, Time and Cost Optimization, Critical Path.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311215 mahdagantengya
Date Deposited: 04 Nov 2024 03:34
Last Modified: 04 Nov 2024 03:34
URI: https://eprints.umm.ac.id/id/eprint/11770

Actions (login required)

View Item
View Item