UMM Institutional Repository

PENERAPAN METODE ANALYTICAL HIERARCHY PROCESS SEBAGAI SALAH SATU CARA PENGAMBILAN KEPUTUSAN PEMILIHAN CUSTOMER (Studi kasus : PT. FEDERAL INTERNATIONAL FINANCE Cabang Malang)

ALMURI, IRWAN (2007) PENERAPAN METODE ANALYTICAL HIERARCHY PROCESS SEBAGAI SALAH SATU CARA PENGAMBILAN KEPUTUSAN PEMILIHAN CUSTOMER (Studi kasus : PT. FEDERAL INTERNATIONAL FINANCE Cabang Malang). Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENERAPAN_METODE_ANALYTICAL_HIERARCHY_PROCESSSEBAGAI_SALAH_SATU_CARA_PENGAMBILAN_KEPUTUSANPEMILIHAN_CUSTOMER.pdf

Download (54kB) | Preview

Abstract

PT.FEDERAL INTERNATIONAL FINANCE Branch Malang is one of the peripatetic private enterprise is credit area. One of the matter which so the necessary for company is determination of decision of giving of credit to society. Determination of good decision will very assist company in election of customer. There is two elementary device to solve an problem that is deductive device and inductive device of device or of system. Deductive device focused at parts of problem, while device of system concentrate on performance of system universally and integrated. more knowledgeable or analytic Hierarchy process with Analytical Hierarchy Process (AHP) beside join both this device in an inwrought and logical framework also can compile feeling and also logic and intuition in an device which is structural to take an decision. Intention of this research is to determine Wight each attribute election of customer and determine formula of candidate of customer. With method of AHP obtained by value each attribute is work remain to : 5, work do not fixed : 1, Earnings < 1 million : 1, Earnings 1-2 million : 2, Earnings 2-3 million ; 3, Earnings 3-5 million ; 4, Earnings more than 5 million ; 5, Expenditure < 1 million ; 5, Expenditure 1-2 million ; 4, Expenditure 2-3 million ; 3, Expenditure 3-5 million ; 2, Expenditure more than 5 million ; 1, Responsibility 1-2 people ; 5, Responsibility 3-4 people ; 3, Above responsibility 5 people ; 1, House private ownership rights status ; 5, Status contracted house ; 2, House status on duty ; 3, House old fellow status ; 2, Credit duration 12-24 months ; 3, Credit duration 25-36 months ; 2, Credit duration > 36 months ; 1, Advanced Money 1-3 million ; 2, Advanced money 3-5 million ; 4, Advanced money more than 5 million ; 5.

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering > Department of Industrial Engineering (26201)
Depositing User: Zainul Afandi
Date Deposited: 01 May 2012 04:50
Last Modified: 01 May 2012 04:50
URI : http://eprints.umm.ac.id/id/eprint/3574

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : repository@umm.ac.id - Website : https://lib.umm.ac.id - Online Catalog : https://laser.umm.ac.id - e-Theses : https://etd.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo