PERENCANAAN PERBANDINGAN PRODUKTIVITAS DAN BIAYA OPERASIONAL TOWER CRANE DAN MOBILE CRANE PADA RENCANA PROYEK PEMBANGUNAN GEDUNG DAKWAH MUHAMMADIYAH SINGOSARI MALANG

Wahyudha, Aldhie Gusti (2024) PERENCANAAN PERBANDINGAN PRODUKTIVITAS DAN BIAYA OPERASIONAL TOWER CRANE DAN MOBILE CRANE PADA RENCANA PROYEK PEMBANGUNAN GEDUNG DAKWAH MUHAMMADIYAH SINGOSARI MALANG. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (454kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (948kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (1MB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (11MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (500kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (7MB) | Request a copy

Abstract

The construction of high-rise buildings in major cities presents its own challenges, particularly in the selection of appropriate heavy equipment. Heavy equipment such as tower cranes and mobile cranes play a crucial role in the construction process, especially in lifting and moving materials to the required heights. The right choice of crane not only affects the efficiency and effectiveness of the project but also the safety and overall costs.
The steps of the work are carried out according to the sequence of activities to be performed. The sequence begins with data collection, including drawings and specifications of each heavy equipment, Tower Crane and Mobile Crane, followed by analysis of both equipment with the help of a concrete bucket. Then, after analyzing the collected data, a comparison is made to reach the conclusion and recommendations stage.
Based on the calculation of the execution time for structural work, which includes concreting and material lifting using a tower crane and a mobile crane, the productivity values obtained are 2.202 M3/hour for the LC Comansa 150 tower crane and 2.055 M3/hour for the RT 130 mobile crane. The most optimal heavy equipment in the planning of the construction project is the LC Comansa 150 tower crane with a higher productivity value of 2.202 M3/hour.

Item Type: Thesis (Undergraduate)
Student ID: 201710340311114
Keywords: Heavy Equipment, Efficiency, Equipment Comparison, Productivity
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201710340311114 201710340311114
Date Deposited: 07 Aug 2024 03:03
Last Modified: 07 Aug 2024 03:03
URI: https://eprints.umm.ac.id/id/eprint/9479

Actions (login required)

View Item
View Item