Fawwaz, Ahmad Fatih (2024) EFEKTIVITAS TATA LETAK TOWER CRANE TERHADAP WAKTU DAN BIAYA (STUDI KASUS PEMBANGUNAN GEDUNG PERKANTORAN PROKLAMASI 46 JAKARTA). Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (1MB) | Preview
BAB I.pdf
Download (198kB) | Preview
BAB II.pdf
Download (1MB) | Preview
BAB III.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
Bab IV.pdf
Restricted to Registered users only
Download (3MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (131kB) | Request a copy
Lampiran.pdf
Restricted to Registered users only
Download (2MB) | Request a copy
Abstract
The selection of Tower crane layout in high-rise building construction significantly influences the success of a project, especially concerning time and cost. Errors in Tower Crane layout selection can lead to increased working hours, ultimately resulting in project cost escalation. Therefore, this research aims to compare the effectiveness of the existing Tower Crane layout (Location A) with the layout determined by the author (Location B), considering various factors such
as time, cost, and field conditions. The data processing results from this study
indicate that Tower Crane Location B is more effective than Tower Crane
Location A in terms of time, cost, and field conditions.
Item Type: | Thesis (Undergraduate) |
---|---|
Student ID: | 201910340311019 |
Keywords: | Tower Crane, Layout, Time and Cost |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
Depositing User: | 201910340311019 ahmadfatihfawwaz |
Date Deposited: | 11 Jun 2024 06:38 |
Last Modified: | 11 Jun 2024 06:38 |
URI: | https://eprints.umm.ac.id/id/eprint/7011 |