ANALISA TINGKAT KERUSAKAN JALAN DAN PERBAIKAN LAPIS TAMBAH (OVERLAY) PERKERASAN LENTUR MENGGUNAKAN METODE BINA MARGA 2017 DAN AASHTO 1993 PADA RUAS JALAN PODOREJO – TUNGGANGRI, KECAMATAN SUMBERGEMPOL, KABUPATEN TULUNGAGUNG, JAWA TIMUR

Putri, Amalia Febriani (2024) ANALISA TINGKAT KERUSAKAN JALAN DAN PERBAIKAN LAPIS TAMBAH (OVERLAY) PERKERASAN LENTUR MENGGUNAKAN METODE BINA MARGA 2017 DAN AASHTO 1993 PADA RUAS JALAN PODOREJO – TUNGGANGRI, KECAMATAN SUMBERGEMPOL, KABUPATEN TULUNGAGUNG, JAWA TIMUR. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (282kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (362kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (4MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (231kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (10MB) | Request a copy

Abstract

This road planning was carried out on the Podorejo-Tunggangri Highway section, Sumbergempol District, Tulungagung Regency. The Podorejo-Tunggangri road is an alternative road to get to the city and this road has been under construction for a long time so that the modes of transportation that pass through this road section have also increased. There is an increase in traffic volume on this road section from year to year, resulting in a decrease in the road's ability to accept the load on it. Therefore, there is a lot of damage to the road pavement. This planning aims to determine the damage that occurred using the PCI Method, as well as appropriate road handling methods using the 2017 Bina Marga and AASHTO 1993 Methods. The damage value on the Podorejo-Tunggangri Road using the PCI Method was obtained at 39,4%. From the planning results using the 2017 Bina Marga Method, it was found that the AC-WC layer thickness was 4 cm, the AC-BC layer thickness was 6 cm. And for the results of the 1993 AASTHO Method, a surface layer thickness of 16 cm was obtained with a Planned Budget (RAB) of Rp 9,314,566,628.85.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311018
Keywords: Keywords: Road Damage, PCI Method, 2017 Bina Marga Method, 1993 AASHTO Method
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Social and Political Science > Department of Communication Science (70201)
Depositing User: 201910340311018 amaliafebriani
Date Deposited: 23 Apr 2024 09:36
Last Modified: 23 Apr 2024 09:36
URI: https://eprints.umm.ac.id/id/eprint/5735

Actions (login required)

View Item
View Item