Optimalisasi Perencanaan Perawatan Mesin Mixer Farfly Dengan Pendekatan Risk-Based Maintenance

Hartanto, Azwar and Wardana, Rahmad Wisnu and Garside, Annisa Kesy (2023) Optimalisasi Perencanaan Perawatan Mesin Mixer Farfly Dengan Pendekatan Risk-Based Maintenance. Jurnal Teknik Mesin dan Pembelajaran (JTMP), 6 (1). pp. 11-18. ISSN 2623-1271

[thumbnail of Hartanto Wardana Garside – Perawatan Berbasis Resiko Estimasi Resiko Evaluasi Resiko Rencana Pemeliharaan.pdf]
Preview
Text
Hartanto Wardana Garside – Perawatan Berbasis Resiko Estimasi Resiko Evaluasi Resiko Rencana Pemeliharaan.pdf

Download (623kB) | Preview
[thumbnail of Similarity - Hartanto Wardana Garside – Perawatan Berbasis Resiko Estimasi Resiko Evaluasi Resiko Rencana Pemeliharaan.pdf]
Preview
Text
Similarity - Hartanto Wardana Garside – Perawatan Berbasis Resiko Estimasi Resiko Evaluasi Resiko Rencana Pemeliharaan.pdf

Download (1MB) | Preview

Abstract

PT XYZ operates as a paint manufacturing company, producing two types of products, namely wall paint and pool paint, based on distinct raw materials. Within the production process, the role of the farfly mixer machine holds significant importance, as it facilitates the crucial mixing and dispersion processes involved in paint manufacturing. Unfortunately, operational usage of the farfly mixer machines often leads to malfunctions, resulting in disruptive downtimes and potential financial losses for the company. Consequently, an enhancement of the machine maintenance planning is imperative, utilizing the risk-based maintenance methodology to ascertain risk estimations associated with machine failures, conduct risk evaluations, and devise appropriate maintenance plans. The assessment of risk estimations yields a significant risk value amounting to IDR 10,459,765 per month. The evaluation results reveal that the calculated risk value surpasses the acceptance criteria, specifically denoting 0.73% compared to the expected threshold of 0.60%. Consequently, based on this risk evaluation outcome, it becomes evident that maintenance planning is warranted, necessitating the formulation of a proposed maintenance plan. The proposed plan focuses on optimising component replacement intervals, primarily targeting components with a reliability value lower than 80%.

Item Type: Article
Keywords: Risk-Based Maintenance, risk estimation, risk evaluation, maintenance planning
Subjects: T Technology > TS Manufactures
Divisions: Faculty of Engineering > Department of Industrial Engineering (26201)
Depositing User: rahmadwisnu78 Rahmad Wisnu Wardana, S.Pd.
Date Deposited: 13 Mar 2024 05:53
Last Modified: 13 Mar 2024 05:53
URI: https://eprints.umm.ac.id/id/eprint/4650

Actions (login required)

View Item
View Item