PERENCANAAN KOLAM RETENSI SEBAGAI UPAYA PENGENDALIAN BANJIR PADA DAERAH ALIRAN SUNGAI WELANG PASURUAN

Mahdiyah, Risyah (2024) PERENCANAAN KOLAM RETENSI SEBAGAI UPAYA PENGENDALIAN BANJIR PADA DAERAH ALIRAN SUNGAI WELANG PASURUAN. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (2MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (205kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (881kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (522kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (203kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Floods are natural disasters that occur in major cities throughout Indonesia. The causes of floods can be attributed to various factors, including topography, high rainfall intensity, blockage of water channels, and so on. Flooding resulting from river overflow occurs almost every year in the Welang Pasuruan river basin. Retention ponds serve as flood control structures in urban areas. The function of retention ponds is to temporarily contain floods or serve as temporary storage during peak river flood times. When the river flow subsides, the water in the retention pond is returned to the river. The planning of retention ponds is expected to reduce the risks associated with flooding. By processing rainfall data for the past 10 years using the Log Pearson III Method, and calculating the planned flood discharge using the Nakayasu Synthetic Unit Hydrograph Method, the analysis of flow profiles is conducted using the HEC-RAS 6.3.1 program under existing conditions with the calculated Q10th. The peak flood discharge is calculated to be 635,531 m3/s with a required time of 4.5 hours to reach the peak, resulting in a river runoff of 3,300,796.49 m3. The total planned area for the retention pond is 398,642 m2 with a depth of 4.5 meters. The maximum storage capacity of the pond is calculated to be 1,793,889 m3, reducing the flood discharge by 1,506,907.491 m3, with a percentage of 54.35%. Therefore, the planning of this retention pond is highly effective in addressing the floods in the Welang River.

Item Type: Thesis (Undergraduate)
Student ID: 201810340311178
Keywords: River, Flood, Retention Pond, Controller
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201810340311178 risyahnm2018
Date Deposited: 15 Feb 2024 08:42
Last Modified: 15 Feb 2024 08:42
URI: https://eprints.umm.ac.id/id/eprint/3959

Actions (login required)

View Item
View Item