PERENCANAAN GEDUNG KANTOR IMIGRASI KLAS II BIAK NUMFOR, PAPUA

Isnain, Mohammad Noviyanto and Hidayat, Rachmat Taufik and Alfalah, Akhmad Elang (2026) PERENCANAAN GEDUNG KANTOR IMIGRASI KLAS II BIAK NUMFOR, PAPUA. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (2MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (696kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (882kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (993kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (5MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (19MB) | Request a copy
[thumbnail of BAB VI.pdf] Text
BAB VI.pdf
Restricted to Registered users only

Download (694kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (25MB) | Request a copy
[thumbnail of POSTER.pdf] Text
POSTER.pdf
Restricted to Registered users only

Download (11MB) | Request a copy

Abstract

Abstract
The Class II Immigration Office Building in Biak Numfor, Papua, is located at Jl. Jend. Sudirman No. 01, Fandoi Village, Biak Kota District, Biak Numfor, Central Papua. Based on the building's function and site class, the planned building falls into risk category IV, located on a medium soil site (SD) and is categorized as KDS D. The superstructure design uses a Medium Moment Resisting Frame System (SRPMM). Based on the calculations and structural analysis, the structural element dimensions include a floor slab thickness of 12 cm and a roof slab thickness of 12 cm with a reinforcement diameter of Ø10. For the longitudinal sub-beam dimensions of 20/30 cm, D12 main reinforcement is used, and Ø10 for shear reinforcement. The longitudinal main beam dimensions are 35/50 cm, and the transverse main beam dimensions are 35/45 with D22 main reinforcement and Ø10 for shear reinforcement. The main column dimensions are 70/70 cm with D22 main reinforcement and Ø10 for shear reinforcement. The substructure is planned to use a 40 cm diameter bore pile foundation with a depth of 6 m. The total planned budget is Rp. 16,268,169,816, with a construction period of 486 days

Item Type: Thesis (Undergraduate)
Student ID: 202010340311032, 202010340311035, 202010340311038
Keywords: Concrete,Foundation,Strauss Pile,Total Planed budget
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 202010340311038 akhmadelang007
Date Deposited: 07 May 2026 05:05
Last Modified: 07 May 2026 05:05
URI: https://eprints.umm.ac.id/id/eprint/29675

Actions (login required)

View Item
View Item