PERENCANAAN TEKNIS GEDUNG RAWAT JALAN RSUD RADEN ACHMAD BASOENI

Azhar, Resa and Saputra, Faisal Aditiya and Cahyono, Moh. Adi Bagus (2026) PERENCANAAN TEKNIS GEDUNG RAWAT JALAN RSUD RADEN ACHMAD BASOENI. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (953kB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (235kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (312kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (338kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (173kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (4MB) | Request a copy
[thumbnail of BAB VI.pdf] Text
BAB VI.pdf
Restricted to Registered users only

Download (183kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (14MB) | Request a copy
[thumbnail of POSTER.pdf] Text
POSTER.pdf
Restricted to Registered users only

Download (12MB) | Request a copy

Abstract

Mojokerto Regency is one of the regions in East Java Province that continues to experience population growth and an increasing need for adequate health facilities. Public health services have become a top priority to support the productivity and welfare of residents in the area. Along with the increasing number of patients, existing facilities need to be developed to provide more optimal service. Therefore, the construction of an Outpatient Building is planned, which includes the planning of the Building's Upper Structure, Lower Structure, Plumbing System, and Construction Management.
The main structure of this Outpatient Building is designed using reinforced concrete with a special moment-resisting frame system to ensure the safety and durability of the building against seismic loads in the Mojokerto Regency area. The planning includes efficient space allocation in accordance with national health service standards. For the substructure, a bored pile foundation type is used with a diameter of 0.6 m and a depth of 14 m. The construction of this building is projected to be completed within a period of 14 months with a total budget of IDR 27.571.007.037,00.

Item Type: Thesis (Undergraduate)
Student ID: 202110340311083, 202110340311077, 202110340311083
Keywords: Planning, Building, Outpatient, Mojokerto Regency, Construction.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 202110340311083 adibagus083
Date Deposited: 19 Feb 2026 07:03
Last Modified: 19 Feb 2026 07:03
URI: https://eprints.umm.ac.id/id/eprint/27791

Actions (login required)

View Item
View Item