Halid, Masyita Aulia and Firdaus, Ariasena and Az Zahra, Belqis Alya and Sabrina, Faza (2025) PERENCANAAN TEKNIS PEMBANGUNAN BENDUNGAN PELOSIKA KAB. KONAWE. Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (4MB) | Preview
BAB I.pdf
Download (247kB) | Preview
BAB II.pdf
Download (466kB) | Preview
BAB III.pdf
Restricted to Registered users only
Download (212kB) | Request a copy
BAB IV.pdf
Restricted to Registered users only
Download (2MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB VI.pdf
Restricted to Registered users only
Download (2MB) | Request a copy
BAB VII.pdf
Restricted to Registered users only
Download (956kB) | Request a copy
BAB VIII.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB IX.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB X.pdf
Restricted to Registered users only
Download (135kB) | Request a copy
BAB XI.pdf
Restricted to Registered users only
Download (240kB) | Request a copy
BAB XII.pdf
Restricted to Registered users only
Download (244kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (10MB) | Request a copy
POSTER.pdf
Restricted to Registered users only
Download (4MB) | Request a copy
Abstract
The Pelosika Dam is one of the national strategic projects located in Konawe Regency, Southeast Sulawesi Province. The construction of this dam is planned to support the sustainable management of water resources and improve the welfare of the people in the surrounding area. The scope of technical planning includes the planning of dam bodies, spillway buildings, avoidance channels, and intake buildings. The analysis was carried out through hydrological calculations with the latest rainfall data from the GPM Satellite for 2022-2024 to determine the planned flood discharge, hydraulic calculations to determine the overflow capacity and dimensions of the avoidance channel, and also stability analysis to ensure the safety of the dam body against rolling force, shear and soil bearing capacity (DDT).
Flood tracing was conducted using the Nakayasu HSS method with a repeat time of Q25th 1089.12 m3/s, Q100th 1144.50 m3/s, Q1000th 1214.92 m3/s and QPMP 1975.88 m3/s. The planning results show that the design of the Pelosika Dam on the dam body uses the type of upright core zone excavation, ogee type overflow building, circle type avoidance building, tower type extraction building that has met the technical aspects and is expected to be able to provide optimal benefits in water supply, flood control, and environmental quality improvement in the Southeast Sulawesi region.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Student ID: | 202010340311190 202010340311264 202010340311284 202010340311294 |
| Keywords: | Pelosika Dam, Hydrological Analysis, Dam Structure, Spillway, Cover Dam, Intake, Southeast Sulawesi |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TC Hydraulic engineering. Ocean engineering T Technology > TH Building construction |
| Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
| Depositing User: | 202010340311264 ariasena4121 |
| Date Deposited: | 17 Nov 2025 05:49 |
| Last Modified: | 17 Nov 2025 05:55 |
| URI: | https://eprints.umm.ac.id/id/eprint/25069 |
