Analisa Komparatif Frame Scaffolding dengan Perth Constrcution Hire (Studi Kasus : Rumah Sakit Umum Aisyiyah Ponorogo)

Jalasenatri, Arfaniar (2023) Analisa Komparatif Frame Scaffolding dengan Perth Constrcution Hire (Studi Kasus : Rumah Sakit Umum Aisyiyah Ponorogo). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of Pendahuluan.pdf]
Preview
Text
Pendahuluan.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (149kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (370kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (317kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (82kB) | Request a copy
[thumbnail of Lampiran.pdf] Text
Lampiran.pdf
Restricted to Registered users only

Download (4MB) | Request a copy

Abstract

In determining scaffolding work, it is necessary to pay attention to several things including cost, quality, and work time. Although scaffolding is only used temporarily, its role is very important to support fresh concrete until it hardens and is able to withstand its own weight. The purpose of comparing several scaffolding methods is to find out which type of scaffolding is more efficient. The procedure carried out in this research is a comparative method. Comparisons were made on two types of scaffolding, namely Frame Scaffolding and Perth Construction Hire (PCH). This research compares the rental price of 6 floors on the Aisyiyah
Ponorogo General Hospital Project for beam, plate, and column formwork. To compare, it is necessary to calculate the volume and duration of work. From the data, it is processed to get the cost of work. Both scaffolding methods are compared based on the duration of work and cost. From the calculation, it is found that Frame Scaffolding costs Rp. 1,881,251,396 with a working time of 90 days while Perth Construction Hire costs Rp. 1,485,585,802 with a working time of 35 days. Perth Construction Hire is 55 days faster than Frame Scaffolding and costs Rp. 395,665,593 or 21% less.

Item Type: Thesis (Undergraduate)
Student ID: 201810340311188
Keywords: Comparative; Scaffolding; Perth Construction Hire; Frame Scaffolding
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201810340311188 arfaniarjalasenatri
Date Deposited: 05 Dec 2023 04:00
Last Modified: 05 Dec 2023 04:00
URI: https://eprints.umm.ac.id/id/eprint/1833

Actions (login required)

View Item
View Item