IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) PADA PERENCANAAN BIAYA DAN WAKTU BANGUNAN PROXIMA TOWER (Studi Kasus Kegiatan Second International Student Competition on Tall Building Design Universiti Teknologi Petronas, Malaysia)

Muslim, M. Puguh Deyustian (2023) IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) PADA PERENCANAAN BIAYA DAN WAKTU BANGUNAN PROXIMA TOWER (Studi Kasus Kegiatan Second International Student Competition on Tall Building Design Universiti Teknologi Petronas, Malaysia). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (93kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (1MB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (5MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (82kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (8MB) | Request a copy

Abstract

This research discusses the application of the Building Information Modeling (BIM) method in planning and analyzing costs and duration of the Proxima Tower building construction project. BIM is a digital solution that can increase effectiveness and efficiency in the construction industry. The analysis results show that BIM is able to calculate concrete volumes in detail (5D), model complex structures efficiently, and provide schedule visualization (4D) to facilitate the construction process.In this study, modeling using BIM produces visualization images that are in accordance with the initial plan. Analysis of project costs using BIM resulted in a total cost of IDR 58,021,626,736 (58 billions), while the total work duration was 447 days or around 15 months. This research provides recommendations for developing further research by adding architectural and MEP elements in modeling, as well as choosing BIM software that can be integrated well. The use of higher BIM dimensions such as BIM 6D and 7D can also be a focus of future research for sustainable construction projects and environmental management.

Item Type: Thesis (Undergraduate)
Student ID: 201810340311150
Keywords: Building Information Modeling, Effectiveness and Efficiency, Cost and Duration Analysis, Scheduling, Digital Construction
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201810340311150 puguhdm
Date Deposited: 05 Dec 2023 02:10
Last Modified: 05 Dec 2023 02:33
URI: https://eprints.umm.ac.id/id/eprint/1819

Actions (login required)

View Item
View Item