PERENCANAAN ULANG JEMBATAN RANGKA BAJA TIPE PARKER PADA BENTANG UTAMA JEMBATAN LUWIHAJI -MEDALEM KABUPATEN BOJONEGORO (STUDI : MANAJEMEN KONSTRUKSI)

Ariyanto, Hanif (2025) PERENCANAAN ULANG JEMBATAN RANGKA BAJA TIPE PARKER PADA BENTANG UTAMA JEMBATAN LUWIHAJI -MEDALEM KABUPATEN BOJONEGORO (STUDI : MANAJEMEN KONSTRUKSI). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (924kB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (151kB) | Preview
[thumbnail of BAB II .pdf]
Preview
Text
BAB II .pdf

Download (509kB) | Preview
[thumbnail of BAB III .pdf] Text
BAB III .pdf
Restricted to Registered users only

Download (154kB) | Request a copy
[thumbnail of BAB IV .pdf] Text
BAB IV .pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V .pdf] Text
BAB V .pdf
Restricted to Registered users only

Download (129kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

As time goes by, development aims to achieve economic value from a project by prioritizing time and cost efficiency in a job. The Kali Luwihaji – Medalem Bridge was built on the road between Kab. Bojonegoro which crosses 1 village road and the Bengawan Solo river.Referring to this background, in this final assignment the author discusses time planning and implementation cost estimates. The Luwihaji-medalem bridge has a span of 60 m. Consisting of two pillars.Based on the results of this final project analysis, the construction of the Luwihaji – Medalem River Bridge structure can be completed within 83 days. And a budget of IDR 24,990,603,705.03 is required

Item Type: Thesis (Undergraduate)
Student ID: 201810340311193
Keywords: Keywords: Parker Type Steel Bridge, Method Construction, Time Duration Test, Structural Analysis.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TG Bridge engineering
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201810340311193 hanifaryan11
Date Deposited: 17 Feb 2025 01:43
Last Modified: 17 Feb 2025 01:43
URI: https://eprints.umm.ac.id/id/eprint/15463

Actions (login required)

View Item
View Item