Ariyanto, Hanif (2025) PERENCANAAN ULANG JEMBATAN RANGKA BAJA TIPE PARKER PADA BENTANG UTAMA JEMBATAN LUWIHAJI -MEDALEM KABUPATEN BOJONEGORO (STUDI : MANAJEMEN KONSTRUKSI). Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (924kB) | Preview
BAB I.pdf
Download (151kB) | Preview
BAB II .pdf
Download (509kB) | Preview
BAB III .pdf
Restricted to Registered users only
Download (154kB) | Request a copy
BAB IV .pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB V .pdf
Restricted to Registered users only
Download (129kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (3MB) | Request a copy
Abstract
As time goes by, development aims to achieve economic value from a project by prioritizing time and cost efficiency in a job. The Kali Luwihaji – Medalem Bridge was built on the road between Kab. Bojonegoro which crosses 1 village road and the Bengawan Solo river.Referring to this background, in this final assignment the author discusses time planning and implementation cost estimates. The Luwihaji-medalem bridge has a span of 60 m. Consisting of two pillars.Based on the results of this final project analysis, the construction of the Luwihaji – Medalem River Bridge structure can be completed within 83 days. And a budget of IDR 24,990,603,705.03 is required
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Student ID: | 201810340311193 |
| Keywords: | Keywords: Parker Type Steel Bridge, Method Construction, Time Duration Test, Structural Analysis. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TG Bridge engineering |
| Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
| Depositing User: | 201810340311193 hanifaryan11 |
| Date Deposited: | 17 Feb 2025 01:43 |
| Last Modified: | 17 Feb 2025 01:43 |
| URI: | https://eprints.umm.ac.id/id/eprint/15463 |
