ANALISIS PENGENDALIAN WAKTU DAN BIAYA SISA PEKERJAAN DENGAN METODE TIME COST TRADE OFF (Studi Kasus : Pada Proyek Pembangunan Gedung Pelayanan Paviliun RSUD Dr. Saiful Anwar Malang)

Firdaus, Muhammad Iqbal Afrilla (2023) ANALISIS PENGENDALIAN WAKTU DAN BIAYA SISA PEKERJAAN DENGAN METODE TIME COST TRADE OFF (Studi Kasus : Pada Proyek Pembangunan Gedung Pelayanan Paviliun RSUD Dr. Saiful Anwar Malang). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (4MB) | Preview
[thumbnail of BAB 1.pdf]
Preview
Text
BAB 1.pdf

Download (643kB) | Preview
[thumbnail of BAB 2.pdf]
Preview
Text
BAB 2.pdf

Download (407kB) | Preview
[thumbnail of BAB 3.pdf]
Preview
Text
BAB 3.pdf

Download (280kB) | Preview
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Registered users only

Download (457kB) | Request a copy
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Registered users only

Download (86kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (952kB) | Request a copy

Abstract

The implementation of a construction project can be influenced by several factors which result in delays in project completion. Therefore, it is necessary to accelerate the process by considering the increasing costs. The Time Cost Trade Off (TCTO) method can be used to optimize project acceleration relative to costs. By using TCTO, it is possible to determine the maximum acceleration level as well as control costs in order to obtain the most effective costs. Based on the results of calculations and analysis of duration acceleration based on data on the Dr. Hospital Pavilion Service Building Construction project. SAIFUL ANWAR Malang. Then, in accordance with the problem formulation and research objectives, the conclusions obtained in this research are: The optimal acceleration time obtained is the addition of 4 working hours with a total project duration of 104.5 days, 31.5 days faster than the normal duration of 136 days. . The costs resulting from the additional 4 hours of overtime work with a total duration of 104.5 days are IDR. 218,125,237 Total project cost after acceleration is IDR 7,553,282,258

Item Type: Thesis (Undergraduate)
Student ID: 201910340311205
Keywords: Keywords: Time Cost Trade Off, Overtime working hours, Additional Costs
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311205 muhammadiqbalafrillafirdaus
Date Deposited: 29 Nov 2023 06:58
Last Modified: 29 Nov 2023 06:58
URI: https://eprints.umm.ac.id/id/eprint/1527