PERENCANAAN GEOMETRIK DAN TEBAL PEKERASAN KAKU (RIGID PAVEMENT) PADA JALAN BUMBANG KECAMATAN PUJUT KABUPATEN LOMBOK TENGAH DENGAN METODE AASHTO 1993 DAN BINA MARGA 2017

Amru, Fayyad Zulfah (2024) PERENCANAAN GEOMETRIK DAN TEBAL PEKERASAN KAKU (RIGID PAVEMENT) PADA JALAN BUMBANG KECAMATAN PUJUT KABUPATEN LOMBOK TENGAH DENGAN METODE AASHTO 1993 DAN BINA MARGA 2017. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (3MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (291kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (895kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (584kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (224kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

This road planning was done on Bumbang Street, Central Lombok Regency. This road planning aims to build the economy in the Central Lombok Regency area. In addition, the planning of this road also aims to facilitate and provide comfort for local and foreign tourists who plan to visit the Gunung Tunak Natural Tourism Site. Therefore, geometric planning and rigid pavement thickness were carried out using the AASHTO 1993 and Bina Marga 2017 Methods. From the results of the geometric planning of the road, a horizontal alignment was obtained with the first bend located at STA 1+900 with a planned speed of 40 km/hour, a lane width of 4 meters, an outer angle of Δ1 = 42° using a Spiral Circle Spiral (SCS) bend. The thickness of the rigid pavement using the AASHTO 1993 method obtained a concrete slab thickness of 400 mm and a foundation layer thickness of 100 mm, with a total Budget Plan (RAB) of Rp 8.451.776.400. Meanwhile, the results of the Bina Marga method obtained a concrete slab thickness of 275 mm, a foundation layer thickness of 100 mm, and a drainage layer of 150 mm, with a total Budget Plan (RAB) of IDR 7.006.674.872
Keywords: Road Geometry, Rigid Pavement, AASHTO 1993, Bina Marga 2017

Item Type: Thesis (Undergraduate)
Student ID: 201910340311072
Keywords: Road Geometry, Rigid Pavement, AASHTO 1993, Bina Marga 2017
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311072 fayyadamru07
Date Deposited: 03 Feb 2025 04:16
Last Modified: 03 Feb 2025 04:16
URI: https://eprints.umm.ac.id/id/eprint/14506

Actions (login required)

View Item
View Item