ANALISIS PERCEPATAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RUMAH SAKIT MUHAMMADIYAH AHMAD DAHLAN KEDIRI

Mochtar, Ahmada Fanani (2025) ANALISIS PERCEPATAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RUMAH SAKIT MUHAMMADIYAH AHMAD DAHLAN KEDIRI. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (727kB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (92kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (460kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (291kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (299kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (79kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (239kB) | Request a copy

Abstract

The construction project of the Muhammadiyah Ahmad Dahlan Hospital in Kediri is one of the projects that has experienced a work delay. Various things can happen in the implementation of a construction project that can cause an increase in the implementation time so that the completion of the project is delayed. Therefore, an acceleration is needed to optimize time by taking into account the cost increase factor. One method that can be used to optimize the effect of project acceleration on the costs that must be incurred is the Time Cost Trade Off (TCTO) method. In TCTO, the maximum acceleration and minimum cost can be known/calculated. The TCTO method is carried out by crashing the project duration. In the crashing method, an analysis of Crash Duration, Crash Cost, and Cost Slope is carried out on the remaining work activities that are on the critical path, then acceleration is carried out until completely saturated. After that, a recapitulation of the acceleration results of the crashing method (optimum and maximum) and fast tracking is carried out. This study produced the most optimal acceleration duration with a final duration of 16 days and a cost of Rp635,963,150.22. Optimum crashing has been able to catch up with the acceleration target due to project delays.

Item Type: Thesis (Undergraduate)
Student ID: 201810340311268
Keywords: Time Cost Trade Off, Acceleration, cost
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201810340311268 ahmadafananiwebmail
Date Deposited: 30 Jan 2025 07:00
Last Modified: 30 Jan 2025 07:00
URI: https://eprints.umm.ac.id/id/eprint/14341