Pratama, Muhammad Farrel Akbar and Asis, Wahyu Iskandar and Subiantoro, Mochammad Tegar and Syaza, Dinar Yunia (2024) PERENCANAAN TEKNIS BANGUNAN WORKSHOP DAN SUKU CADANG PT. SARIGUNA PRIMATIRTA PLANT PALEMBANG. Undergraduate thesis, Universitas Muhammadiyah Malang.
Pendahuluan.pdf
Download (2MB) | Preview
BAB I.pdf
Download (518kB) | Preview
BAB II.pdf
Download (700kB) | Preview
BAB III.pdf
Download (945kB) | Preview
BAB IV.pdf
Restricted to Registered users only
Download (96kB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (13MB) | Request a copy
BAB VI.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB VII.pdf
Restricted to Registered users only
Download (263kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (9MB) | Request a copy
Project Poster.pdf
Restricted to Registered users only
Download (9MB) | Request a copy
Abstract
Supporting manufacturing facilities, such as workshops, enable enhanced maintenance efficiency, minimize production downtime, and improve maintenance quality. To meet these needs, adequate supporting manufacturing facilities are essential. The “Technical Planning of the Workshop and Spare Parts Building for PT. Sariguna Primatirta Plant Palembang” is designed according to the manufacturing requirements of the site, utilizing steel as the primary construction material due to its numerous advantages, such as reduced construction time, seismic resistance, and uniform material quality. The workshop and spare parts building is planned to have dimensions of 36 m in length, 12 m in width, and three stories in height. The design adheres to the latest regulations, including SNI 1725:2020, SNI 1727:2020, SNI 7860:2020, SNI 2847:2019, and SNI 1726:2019. The planning results in a slab thickness of 150 mm with M10-200 wire mesh reinforcement; secondary beams using WF 200.100.5.5.8 profiles; primary beams using WF 300.150.6.5.9 profiles; and columns using HB 300.300.10.15 and WF 300.150.6.5.9 profiles. The foundation piles are designed to be installed at a depth of 8 m, resting on an SPT 60 layer. The total estimated budget required is Rp 6.019.450.000,- with a construction duration of 115 days.
Item Type: | Thesis (Undergraduate) |
---|---|
Student ID: | 202010340311248, 202010340311258, 202010340311257, 202010340311265 |
Keywords: | Industrial Building, Warehouse Structure, Structural Planning |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
Depositing User: | 202010340311248 farelbarama |
Date Deposited: | 04 Nov 2024 06:15 |
Last Modified: | 04 Nov 2024 06:15 |
URI: | https://eprints.umm.ac.id/id/eprint/12168 |