Pratama, M. Djody Magenda (2024) PERENCANAAN PENJADWALAN PELAKSANAAN PADA PROYEK DITRESKRIMSUS POLDA JAWA TIMUR DENGAN MENGGUNAKAN METODE PERT. Undergraduate thesis, Universitas Muhammadiyah Malang.
PENDAHULUAN.pdf
Download (2MB) | Preview
BAB I.pdf
Download (525kB) | Preview
BAB II.pdf
Download (1MB) | Preview
BAB III.pdf
Download (1MB) | Preview
BAB IV.pdf
Restricted to Registered users only
Download (1MB) | Request a copy
BAB V.pdf
Restricted to Registered users only
Download (358kB) | Request a copy
LAMPIRAN.pdf
Restricted to Registered users only
Download (10MB) | Request a copy
Abstract
Common problems in implementing construction projects are delays and discrepancies between implementation on site and the predetermined schedule, thereby extending the completion time of construction projects and increasing costs compared to the initial plan. In the East Java Regional Police Disreskrimsus project, alternative scheduling is needed for the project so that it can be used as reference material and knowledge about the PERT method. The project plan duration is 180 days, after analysis using the PERT method, the target duration is 152 days with a probability of 99.36%. The total project cost budget is Rp. 21,130,716,674.10 after experiencing acceleration with additional workforce and overtime working hours in accordance with the target duration to Rp. 25,040,218,256.
.
Item Type: | Thesis (Undergraduate) |
---|---|
Student ID: | 201810340311262 |
Keywords: | PERT method, overtime, additional labor, additional costs. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering > Department of Civil Engineering (22201) |
Depositing User: | 201810340311262 djodymagenda14 |
Date Deposited: | 04 Nov 2024 02:32 |
Last Modified: | 04 Nov 2024 02:32 |
URI: | https://eprints.umm.ac.id/id/eprint/12119 |