IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) UNTUK PERENCANAAN BIAYA DAN WAKTU PEKERJAAN STRUKTUR PADA BANGUNAN GEDUNG (Studi Kasus: Gedung RSUD Anugrah Sehat Afiat Depok)

Prasetya, Muhamad Gandung (2024) IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) UNTUK PERENCANAAN BIAYA DAN WAKTU PEKERJAAN STRUKTUR PADA BANGUNAN GEDUNG (Studi Kasus: Gedung RSUD Anugrah Sehat Afiat Depok). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN (2).pdf]
Preview
Text
PENDAHULUAN (2).pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (130kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (621kB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (346kB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (10MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (118kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (18MB) | Request a copy

Abstract

Technological developments in the construction sector have created a
breakthrough digital modeling system called Building Information Modeling
(BIM). One solution to overcome cost and time efficiency is the use of Building
Information Modeling (BIM) to increase productivity in construction companies.
The use of BIM in construction projects has provided great benefits in increasing
project productivity. The benefits obtained when BIM is implemented in
construction projects are reducing costs, increasing productivity, reducing the
occurrence of work errors, and improving the quality of project work. Using BIM
utilizes 3-dimensional (3D) digital models to represent a construction project. The
3D model contains geometry which is a representation of each width, height and
length of the building in the construction project. Apart from 3D models, BIM also
contains information that has been classified into several dimensions such as
scheduling (4D), cost estimation (5D), sustainability (6D), and facilities
management (7D). Based on the implementation of Building Information Modeling
(BIM), the total cost is obtained at IDR 59.867.665.052,79. and the total duration
of structural work is 198 days.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311069
Keywords: Building Information Modeling (BIM), Efficiency, Cost and Duration Analysis, Scheduling, Digital Modeling.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311069 muhamadgandung
Date Deposited: 30 Oct 2024 01:46
Last Modified: 30 Oct 2024 01:46
URI: https://eprints.umm.ac.id/id/eprint/11954

Actions (login required)

View Item
View Item