STUDI PERENCANAAN STRUKUTR BAWAH PONDASI BORE PILE PADA GEDUNG RUMAH SAKIT SEHATI GRESIK

Hutomo, Kemal Dewo (2024) STUDI PERENCANAAN STRUKUTR BAWAH PONDASI BORE PILE PADA GEDUNG RUMAH SAKIT SEHATI GRESIK. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (279kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (2MB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (1MB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (4MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (259kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (5MB) | Request a copy

Abstract

In high-rise buildings, the use of bored pile foundations has the aim of resisting the forces acting on the upper structure of the building. Based on analysis using the STAAD.Pro V8i application software, it was found that the largest axial load at grid column point H-4 was 3538.07 kN. The planned drilled pile foundation with a diameter of 0.6 m with a pile bearing capacity of 1696.307 kN and a group pile bearing capacity of 4394.28 kN with eight meters depth. There will be 3 types of pile cap are planned, type 1 use dimensions of 5.4 m x 1.8 m x 1 m, type 2 has dimeensions 3.0 m x 1.5 m x 1 m, and type 3 is for single pile has dimentions 1.2 m x 1.2 m x 0.4 m. This type of pile cap is obtained from the largest axial load, with a reinforcement arrangement of D22 – 100 mm for pile cap types one and two also D19 – 100 m for the third type in the x and y direction pile cap reinforcement, while for the reinforcement for use D22 – 100 mm and D19-100 mm. The largest immediate settlement occurred at 1.084 cm and the largest consolidation settlement occurred in Grid H-4 at 6.86 cm and will occurre in 60 years. The settlement in tall buildings is required to meet the equation S < 15+b/600 and is found to be 7.945 cm < 15.9 cm, thus fulfilling the equation based on (SNI 8460-2017:178) concerning Geotechnical engineering.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311164
Keywords: Bored Pile Foundation, Bearing Capacity, Pile Cap, Reinforcement, Settlement.
Subjects: Q Science > Q Science (General)
Q Science > QC Physics
Q Science > QE Geology
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311164 kemaldewohutomo
Date Deposited: 29 Oct 2024 03:19
Last Modified: 29 Oct 2024 03:19
URI: https://eprints.umm.ac.id/id/eprint/11894

Actions (login required)

View Item
View Item