STUDI PERENCANAAN PONDASI TIANG BOR PADA ABUTMENT DAN PILAR PENYANGGA JEMBATAN BARU KERETA API SUNGAI PORONG DI PROYEK JALUR GANDA MOJOKERTO–SEPANJANG

Setiariawan, Agus Aulia (2024) STUDI PERENCANAAN PONDASI TIANG BOR PADA ABUTMENT DAN PILAR PENYANGGA JEMBATAN BARU KERETA API SUNGAI PORONG DI PROYEK JALUR GANDA MOJOKERTO–SEPANJANG. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (9MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (8MB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (8MB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (8MB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (7MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (8MB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

The structure of the new Porong River railway bridge requires Abutments
and pillars with strong foundations. This bridge uses a bored pile foundation.
The new bridge for this double track railway project is on predominantly sandy
soil with an average N-SPT value of 50, located at a depth of 39.36 meters. The
planning and type of substructure (foundation) need to be carefully calculated
to avoid settlement due to forces acting on the structure above. This can be
overcome by using a drilled pile foundation which will transfer the working
forces into the soil layer below the foundation. The bearing capacity of the
foundation is influenced by variables such as cohesion (c), unit weight (y), and
soil shear angle (p). The location of hard soil can be determined using the
Standard Penetration Test (SPT) which will be the basis for calculating the
bearing capacity of drilled piles. The writing of this final project is focused on
the planning study of bored piles on the Abutment (A2) located at KM 49+242
and the supporting pillars (P3) located at KM 49+166 of the new Porong River
railway bridge in the Mojokerto–Sepanjang double track project.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311132
Keywords: Foundation, Bored Pile Foundation
Subjects: Q Science > Q Science (General)
Q Science > QA Mathematics
Q Science > QC Physics
Q Science > QE Geology
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311132 agusauliasetiariawan
Date Deposited: 16 Aug 2024 02:38
Last Modified: 16 Aug 2024 02:38
URI: https://eprints.umm.ac.id/id/eprint/10452

Actions (login required)

View Item
View Item