PERENCANAAN STRUKTUR BAWAH DENGAN MENGGUNAKAN PONDASI BORE PILE PADA STADION OLIMPIC MINI TELUK BAYUR KABUPATEN BERAU KALIMANTAN TIMUR

Hidayat, Rohman (2024) PERENCANAAN STRUKTUR BAWAH DENGAN MENGGUNAKAN PONDASI BORE PILE PADA STADION OLIMPIC MINI TELUK BAYUR KABUPATEN BERAU KALIMANTAN TIMUR. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (5MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (558kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (1MB) | Preview
[thumbnail of BAB III.pdf]
Preview
Text
BAB III.pdf

Download (1MB) | Preview
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (386kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

The construction of the Teluk Bayur Mini Olympic Stadium located in Teluk Bayur District, Teluk Bayur District, Berau Regency, East Kalimantan is planned to support the Provincial Sports Week (PORPROV) activities in 2022. In the existing condition, using a pile foundation, so the author tries to plan the foundation on the side stand using a Bore Pile foundation because from the borlog data N-SPT>50 is obtained at a depth of 2 m. The stands have a width of 22m and a length of 115m which are divided into 3 segments. This planning uses the help of sap 2000 software to get the load working. Based on the results of the analysis and calculation of the loading of the upper structure, the largest load was obtained PPu = 1120.346 kN. For the calculation of the foundation support capacity, the depth of the foundation is planned at a depth of 10 meters with a diameter of 0.4 meters and where the bearing capacity is obtained at a single point of 1181.237 kN and a group with an efficiency of 100% is obtained a carrying capacity of 1181.237 kN. Pile caps repetition uses D16-100 mm reinforcement for D16-175 mm. The largest immediate decrease was 0.0124 m. Because this planning only uses one log drill point, it is necessary to conduct another soil investigation to make it safer.

Item Type: Thesis (Undergraduate)
Student ID: 201710340311053
Keywords: Teluk Bayur Mini Olympic Stadium, Bore Pile Foundation, Loading, Carrying Capacity.
Subjects: Q Science > Q Science (General)
Q Science > QA Mathematics
Q Science > QC Physics
Q Science > QE Geology
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201710340311053 rohmanhidayat
Date Deposited: 13 Aug 2024 03:40
Last Modified: 13 Aug 2024 03:40
URI: https://eprints.umm.ac.id/id/eprint/10082

Actions (login required)

View Item
View Item