RENCANA PENGEMBANGAN FASILITAS PELAYANAN PERPUSTAKAAN DENGAN VALUE ENGINEERING (Studi Kasus pada SMK Negeri 10 Malang)

Triwahyudi, Nanang (2008) RENCANA PENGEMBANGAN FASILITAS PELAYANAN PERPUSTAKAAN DENGAN VALUE ENGINEERING (Studi Kasus pada SMK Negeri 10 Malang). Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
RENCANA_PENGEMBANGAN_FASILITAS_PELAYANANPERPUSTAKAAN_DENGAN_VALUE_ENGINEERING.pdf

Download (54kB) | Preview

Abstract

Library of SMK Negeri 10 Malang Worse luck represent one of very important supporter element in management of education specially to student. Its [of] him have ability and strength capable to influence development of intellectual sources, because its very important role this is hence expected by library of Vocational High School Country 10 Worse luck can give best service [of] him so that can fulfill and desire consumer of library. To get best service system desain which expected, hence research represent one way of able to be done/conducted to identify importance of desire dab from consumer of library. Research with Engineering Value method represent research which relate [at] importance all student and organizer of library. This research is relied on given assessment pass/through kuesioner. Because target which wish to be reached [by] [is]satisfaction of consumer of library , hence target of kuesioner responden isconsumer of library and [all] expert which [is] have competence in library. Phases performed within Engineering [job/activity] plan Assess this consist of 5 phase, that is : Phase Information, Creative Phase, Phase Analysis, Phase Growth, and Phase Recommendation. Pursuant to result of analysis which have been [done/conducted] in the plan the make-up of service value [in] library of SMK Country 10 Worse luck this, hence alternative of desain proposal assumed can fulfill criterion expected by [all] consumer of library with existence of the make-up of performansi 25,909 make-up of value 108.7 and degradation of biaya39,67 of desain early. alternative of Desain chosen from result of analysis [is] alternative 118 with value of V = 2,087 and alternative 103 with value of V = 2.054 Alternative 1 having budget which relative cheaper than alternative 2, so that very big having an in with [of] got value.

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering > Department of Industrial Engineering
Depositing User: Rayi Tegar Pamungkas
Date Deposited: 12 Jun 2012 02:32
Last Modified: 12 Jun 2012 02:32
URI: http://eprints.umm.ac.id/id/eprint/7183

Actions (login required)

View Item View Item