Browse by Contributors
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 2.
Thesis
Akbar, Febry Noer (2024) ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING METODE KONVENSIONAL DENGAN METODE SISTEM PERI (Proyek Pembangunan Gedung Sekolah Gloria Grand Pakuwon Surabaya). Undergraduate thesis, Universitas Muhammadiyah Malang.
Susanto, Ricki Imron (2022) PENGARUH MANAJEMEN KESELAMATAN DAN KESEHATAN DAN LINGKUNGAN (SMK3L) TERHADAP PRODUKTIVITAS TENAGA KERJA PROYEK PASAR KOLPAJUNG PAMEKASAN MADURA. Undergraduate thesis, Universitas Muhammadiyah Malang.
Up a level