PERENCANAAN JARINGAN AIR BERSIH DESA NGENEP KACAMATAN KARANGPLOSO

Zulkarnain, Sari Nefiyanti and Alif, Dimas Syafriel Naufal and Rahman, Andi Nur Rasyidi (2026) PERENCANAAN JARINGAN AIR BERSIH DESA NGENEP KACAMATAN KARANGPLOSO. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (3MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (402kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (589kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (79kB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (876kB) | Request a copy
[thumbnail of BAB VI.pdf] Text
BAB VI.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB VII.pdf] Text
BAB VII.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of BAB VIII.pdf] Text
BAB VIII.pdf
Restricted to Registered users only

Download (669kB) | Request a copy
[thumbnail of BAB IX.pdf] Text
BAB IX.pdf
Restricted to Registered users only

Download (204kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (7MB) | Request a copy

Abstract

The provision of clean water in Ngenep Village, Karangploso District, Malang Regency has become an essential need in line with population growth, thus requiring a sustainable distribution system planning up to the design year. This study aims to design a clean water distribution network through the analysis of water demand, pipeline network planning, reservoir design, and pump selection, with water sources originating from the Umbulan and Nyolo springs. The methods employed include population projection, water demand calculation, and network simulation using WaterCAD to obtain optimal flow and pressure conditions. The results indicate that the peak hour water demand reaches 42.497 liters per second, with a distribution system utilizing HDPE pipes with a main diameter of 141 mm, a reservoir capacity of 120 m³, and a centrifugal pump with a total head of 80 m. The total estimated project cost is IDR 4,212,636,909.85, with an implementation period of 117 working days. Therefore, the system is expected to meet the community’s water needs effectively, efficiently, and sustainably.

Item Type: Thesis (Undergraduate)
Student ID: 20110340311155
Keywords: clean water, distribution, WaterCAD, reservoir, centrifugal pump
Subjects: Q Science > Q Science (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 202110340311155 dimassyafriel
Date Deposited: 08 May 2026 09:38
Last Modified: 08 May 2026 09:38
URI: https://eprints.umm.ac.id/id/eprint/29757

Actions (login required)

View Item
View Item