PERENCANAAN GEDUNG PERKULIAHAN UNIVERSITAS CENDRAWASIH

Syauqi, Fauzan Akmal and Ariadi, Putra Astaman and Putra, Nabil Virgiawan (2026) PERENCANAAN GEDUNG PERKULIAHAN UNIVERSITAS CENDRAWASIH. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB 1.pdf]
Preview
Text
BAB 1.pdf

Download (929kB) | Preview
[thumbnail of BAB 2.pdf]
Preview
Text
BAB 2.pdf

Download (922kB) | Preview
[thumbnail of BAB 3.pdf]
Preview
Text
BAB 3.pdf

Download (1MB) | Preview
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Registered users only

Download (5MB) | Request a copy
[thumbnail of BAB 6.pdf] Text
BAB 6.pdf
Restricted to Registered users only

Download (934kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (14MB) | Request a copy
[thumbnail of POSTER.pdf] Text
POSTER.pdf
Restricted to Registered users only

Download (173kB) | Request a copy

Abstract

The lecture building of Cenderawasih University is located on Abepura–Sentani–Kota Baru Road, Abepura District, Jayapura, Papua Province. Based on the building function and site classification, the structure is categorized as Risk Category IV, located on medium soil (SD), and classified under Seismic Design Category (SDC) D. The superstructure is designed using a Special Moment Resisting Frame (SMRF) system. Based on the results of structural analysis and calculations, the dimensions of the structural elements are obtained as follows: floor slab thickness of 12 cm and roof slab thickness of 10 cm, both reinforced with Ø10 bars. Secondary beams with dimensions of 30/50 cm use D12 main reinforcement and Ø10 shear reinforcement. Primary beams in the longitudinal direction have dimensions of 40/60 cm, while transverse primary beams are 40/70 cm, both using D22 main reinforcement and Ø10 shear reinforcement. The main columns have dimensions of 70/70 cm with D22 main reinforcement and Ø10 shear reinforcement. The substructure is designed using bore pile foundations with a diameter of 40 cm and a depth of 7 m. The total estimated construction cost is Rp. 16,268,169,816, with a construction duration of 486 days.

Item Type: Thesis (Undergraduate)
Student ID: 202010340311046
Keywords: Reinforced Concrete, Foundation, Bore Pile, Bugdet Plan.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 202010340311046 putraastaman
Date Deposited: 30 Apr 2026 07:33
Last Modified: 30 Apr 2026 07:33
URI: https://eprints.umm.ac.id/id/eprint/29441

Actions (login required)

View Item
View Item