ANALISIS PENGUKURAN BEBAN KERJA DI BIDANG PEMBUATAN CAT DAN THINNER MENGGUNAKAN METODE WISN (STUDI KASUS : PT. INTI DAYA GUNA ANEKA WARNA)

Ilham, Igo (2026) ANALISIS PENGUKURAN BEBAN KERJA DI BIDANG PEMBUATAN CAT DAN THINNER MENGGUNAKAN METODE WISN (STUDI KASUS : PT. INTI DAYA GUNA ANEKA WARNA). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (1MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (671kB) | Preview
[thumbnail of BAB II.pdf]
Preview
Text
BAB II.pdf

Download (903kB) | Preview
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (946kB) | Request a copy
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (625kB) | Request a copy
[thumbnail of BAB VI.pdf] Text
BAB VI.pdf
Restricted to Registered users only

Download (664kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (441kB) | Request a copy

Abstract

The production process at PT Indana Paint involves a series of lengthy stages, each of which requires different levels of work intensity. The company faces issues related to workload imbalance among workers across various departments, where some employees experience excessive workloads while others have excessive idle time. This study aims to address these issues by measuring workload using the Workload Indicators of Staffing Need (WISN) method. The WISN method enables the company to identify and quantify staffing requirements based on task duration and frequency, as well as to calculate the gap between available and required manpower. The results indicate that workload analysis using the WISN method is able to quantitatively determine workforce requirements based on the mapping of main production activities. The calculation produced a WISN ratio of 0.85, indicating a shortage of manpower, particularly in the main production line units, while the quality control and maintenance units were relatively sufficient. These findings reveal an imbalance in workforce distribution that has the potential to cause excessive workload among production operators.

Item Type: Thesis (Undergraduate)
Student ID: 201910140311142
Keywords: kload Measurement, PT Indana Paint, Workload Indicators of Staffing Need (WISN)
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Faculty of Engineering > Department of Industrial Engineering (26201)
Depositing User: 201910140311142 igoilham
Date Deposited: 14 Apr 2026 08:58
Last Modified: 14 Apr 2026 08:58
URI: https://eprints.umm.ac.id/id/eprint/28986

Actions (login required)

View Item
View Item