PERENCANAAN INFRASTRUKTUR PENGHUBUNG LEDOK - BANJARSARI

Sumaryanto, Taufiq and Sutaji, Sailendra Sukma and Azizi, Muhammad Azhar (2026) PERENCANAAN INFRASTRUKTUR PENGHUBUNG LEDOK - BANJARSARI. Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (983kB) | Preview
[thumbnail of BAB 1.pdf]
Preview
Text
BAB 1.pdf

Download (322kB) | Preview
[thumbnail of BAB 2.pdf]
Preview
Text
BAB 2.pdf

Download (906kB) | Preview
[thumbnail of BAB 3.pdf] Text
BAB 3.pdf
Restricted to Registered users only

Download (417kB) | Request a copy
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Registered users only

Download (246kB) | Request a copy
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Registered users only

Download (10MB) | Request a copy
[thumbnail of BAB 6.pdf] Text
BAB 6.pdf
Restricted to Registered users only

Download (862kB) | Request a copy
[thumbnail of BAB 7.pdf] Text
BAB 7.pdf
Restricted to Registered users only

Download (415kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (5MB) | Request a copy
[thumbnail of POSTER.pdf] Text
POSTER.pdf
Restricted to Registered users only

Download (122kB) | Request a copy

Abstract

The Ledok – Banjarsari Bridge is planned as a connecting infrastructure across the Bengawan Solo River in Bojonegoro Regency. The bridge is designed as a steel arch bridge with a 120 m span length, 24 m arch height, and a total width of 9 m, accommodating two traffic lanes and pedestrian sidewalks on both sides. The planning covers the design of the superstructure and substructure, foundation analysis, and cost estimation based on applicable design standards. The results indicate that the proposed bridge satisfies structural strength, stability, and serviceability requirements. The total estimated construction cost for the bridge is IDR 72,858,018,848. This bridge planning is expected to improve regional connectivity, enchance community mobility, and support sustainable local economic development.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311038 201910340311027 201910340311028
Keywords: Steel Arch Bridge, 120 m Span, Bridge Planning, Cost Estimation, Bojonegoro
Subjects: T Technology > TG Bridge engineering
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311038 taufiqsumaryanto
Date Deposited: 20 Feb 2026 08:49
Last Modified: 20 Feb 2026 08:49
URI: https://eprints.umm.ac.id/id/eprint/27879

Actions (login required)

View Item
View Item