Perencanaan Perkerasan Kaku (Rigid Pavement) Pada Ruas Jalan Tol Probolinggo - Banyuwangi Seksi 3 (STA 32+500 – STA 35+900)

Chaniago, Mega Rang (2025) Perencanaan Perkerasan Kaku (Rigid Pavement) Pada Ruas Jalan Tol Probolinggo - Banyuwangi Seksi 3 (STA 32+500 – STA 35+900). Undergraduate thesis, Universitas Muhammadiyah Malang.

[thumbnail of PENDAHULUAN.pdf]
Preview
Text
PENDAHULUAN.pdf

Download (3MB) | Preview
[thumbnail of BAB 1.pdf]
Preview
Text
BAB 1.pdf

Download (232kB) | Preview
[thumbnail of BAB 2.pdf]
Preview
Text
BAB 2.pdf

Download (805kB) | Preview
[thumbnail of BAB 3.pdf] Text
BAB 3.pdf
Restricted to Registered users only

Download (213kB) | Request a copy
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Registered users only

Download (152kB) | Request a copy
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (277kB) | Request a copy

Abstract

Toll roads play an important role in supporting the country's economic growth. The Trans Java Toll Road is one of the government's efforts to support development in Indonesia to grow. This toll road stretches from the western tip to the eastern tip of Java Island. The Trans Java Toll Road has a total length of 1132 kilometers. This project has 18 toll road sections, the last section is the Probolinggo - Banyuwangi Toll Road which has a length of 171.52 kilometers consisting of 7 sections. In this final project will discuss about rigid pavement on toll road. The location taken is included in section 3 Paiton - Besuki. The purpose of this planning is to plan the thickness of rigid pavement and the budget plan that needs to be spent in toll road planning. The data needed include lhr data, rainfall data, soil cbr data and location maps, after all data is collected, planning is carried out using the AASHTO 1993 and Bina Marga 2017 methods then ending with the calculation of the RAB in accordance with the planned pavement thickness. So that the design results of the concrete slab thickness of 34 cm are obtained using the AASHTO 1993 method, while in the planning using the Bina Marga 2017 method, the concrete slab thickness is around 21 cm. For the budget plan obtained in each method, the results are different. In the AASHTO 1993 method, the resulting cost plan is Rp. 105,674,513,703.03. While rigid pavement using the Bina Marga 2017 method, the cost plan is Rp. 69,477,220,342.17. This budget plan has differences due to the different rigid pavement thickness planning results.

Item Type: Thesis (Undergraduate)
Student ID: 201910340311301
Keywords: Toll Road, Probolinggo, Rigid Pavement.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Engineering > Department of Civil Engineering (22201)
Depositing User: 201910340311301 megarchaniago
Date Deposited: 19 Aug 2025 05:30
Last Modified: 19 Aug 2025 05:30