Nurhakim, Insan (2008) MINIMASI WAKTU MENGANGGUR UNTUK KESEIMBANGAN LINTASAN PRODUKSI DENGAN SIMULASI (Study Kasus Pada PT. Sinarberlian Chemindo � Gresik). Other thesis, University of Muhammadiyah Malang.
|
Text
MINIMASI_WAKTU_MENGANGGUR_UNTUKKESEIMBANGAN_LINTASAN_PRODUKSIDENGAN_SIMULASI.pdf Download (70kB) | Preview |
Abstract
A certain number of precentage and number of work load in each operator that unsuitable in circulation process production to invent Blade product DB8, concequence waste of time with doing nothing (idle time) in work station, so work efficiency level is low. Based on that condition, line balancing must needed. Using simulation theory is change the number of percentage and the number of work load in each operator. It can less the time of idle time in each work station, so balance of circulation (line balancing) with efficiency level becomes high. After through analysis problem, a count and discussion that concluded with beginning percentage number is 25% and change a number of work station in each operator there are: for operator 1 process 1, 2, 4, 5 dan process 6, for operator 2 process 1, 2, 3, 4, 5, 7 dan process 8 and last for operator 3 process 3, 4, 5, 6, 7 dan process 8, the result the idle time less until 6,46% than the beginning process 322,85 second/600unit and efficiency level increase 75,114% with high level unit 64 unit/day and netto level becomes 628.026,38/day than the beginning condition.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering > Department of Industrial Engineering (26201) |
Depositing User: | Anggit Aldila |
Date Deposited: | 24 May 2012 03:30 |
Last Modified: | 24 May 2012 03:30 |
URI : | http://eprints.umm.ac.id/id/eprint/5812 |
Actions (login required)
![]() |
View Item |