PRAMONO, PRAMONO (2010) PERANCANGAN DAN PEMBUATAN PERKAKAS BANTU UNTUK MODUL SAMBUNGAN BAMBU TIPE KERUCUT. Other thesis, University of Muhammadiyah Malang.
|
Text
PERANCANGAN_DAN_PEMBUATAN_PERKAKAS_BANTU_UNTUK_MODUL_SAMBUNGAN_BAMBU_TIPE_KERUCUT.pdf Download (86kB) | Preview |
Abstract
Bamboo traditional construction had been proved at home construction in Earthquake Zone where home construction with bamboo construction still stands on intact post earthquake whereas, many brick or concrete construction buildings destroy. Bamboo has some of weaknesses as building materials; physically it is difficult to be made mechanically because of dimensional variation and length difference in bamboo connections. Based on the statement above, it need to be designed an aid tool to clipped bamboo and make center line so that connection of cone bamboo will be made easier. This bamboo clip system used “ V “ form where the system was moved with handle and transmitted to ulir pivot by chain and cogwheel for bottom clip from up ulir pivot to bottom ulir pivot. The working of bamboo will be gripped both of center line. Based on the research that push force was 28 N/mm2 to 65 N/mm2 therefore, from the push force it designed grip aid tool to process the making of bamboo connections.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Faculty of Engineering > Department of Mechanical Engineering (21201) |
Depositing User: | Rayi Tegar Pamungkas |
Date Deposited: | 16 May 2012 07:30 |
Last Modified: | 16 May 2012 07:30 |
URI : | http://eprints.umm.ac.id/id/eprint/5474 |
Actions (login required)
![]() |
View Item |