UMM Institutional Repository

PERANCANGAN MESIN PERONTOK PADIKAPASITAS 500 kg/jam

HABIBI, MUHAMMAD (2008) PERANCANGAN MESIN PERONTOK PADIKAPASITAS 500 kg/jam. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PERANCANGAN_MESIN_PERONTOK_PADIKAPASITAS_500_kg.pdf

Download (51kB) | Preview

Abstract

After the rice is harvest, unhulled paddy separated from the stalks. The shedding should be quickly done after having harvest by footing (± 60 hours for 1 hectare), stering (± 16 hours for 1 hectare). The method in sheding the rice used two cylinders chrusher. Exploiting the swindle motor continuely by transmition system to outside of cylinder, whereas, the inside of cylinder is silent in order to give emphasize and chrush continuely to the rice. The swindle cylinder is given screw to distribute the rice from inside channel to the outside channel and given filter in outside channeling order to separate the hull of rice with the rice. The capacity that got from a swindle was 1000 rice (28,23 g/rev). The rice shedder machine which was planned hased on the result account in order to got the planning of rice shedder machine with capacity 500 kg/hour, with length 700 mm and diameter 750 mm.

Item Type: Thesis (Other)
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Faculty of Engineering > Department of Mechanical Engineering (21201)
Depositing User: Anggit Aldila
Date Deposited: 04 May 2012 02:34
Last Modified: 04 May 2012 02:34
URI : http://eprints.umm.ac.id/id/eprint/4206

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : repository@umm.ac.id - Website : https://lib.umm.ac.id - Online Catalog : https://laser.umm.ac.id - e-Theses : https://etd.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo