STUDI PERENCANAAN ALOKASI BIAYA, WAKTU DAN SUMBERDAYA PADA PROYEK PEMBANGUNAN RUAS JALAN WONOREJO KABUPATEN LUMAJANG - BATAS KABUPATEN JEMBER

NADHIF, MUHAMMAD (2009) STUDI PERENCANAAN ALOKASI BIAYA, WAKTU DAN SUMBERDAYA PADA PROYEK PEMBANGUNAN RUAS JALAN WONOREJO KABUPATEN LUMAJANG - BATAS KABUPATEN JEMBER. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
STUDI_PERENCANAAN_ALOKASI_BIAYA.pdf

Download (52kB) | Preview

Abstract

Construction Management or project management is an activity of planning, organizing, directing and controlling of human resources, funds, time, technology and materials to achieve the objectives to be achieved. In planning the project there are a variety of activities which are numerous, so we need a good management for timely execution of work efficiently and effectively as possible. Cost is one of the principal concerns in addition to scheduling processing managers control resources, every execution of development such as building roads, since it began a feasibility study and planning of consultants and contractors, the implementation by the contractor until the Operating, maintenance is definitely going to cost. The purpose of the analysis time in the implementation of this project is to study the behavior of the implementation of activities during project implementation. By the time the analysis is expected to set priorities at each stage, and when there are changes in timing of events can be predicted the consequences that can immediately take the necessary decisions. Resources are the most important component in a project plan. In this case the meaning of resource planning is the process of identifying the type and amount of resources according to a predetermined schedule purposes. The purpose of planning is to see to it the required resources are available just in time, should not be too early or too late, as both are sources of waste. Based on the analysis and discussion that has been done then obtained a total cost of Rp.28.442.299.500, 00 (including VAT 10%), human resources are in use during the project is 140 people, planning the project can be completed during the 240 days of work (8 Months) and operational costs of heavy equipment require 13 kinds of heavy equipment with the total cost. 4,488,885,217.0

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Anggit Aldila
Date Deposited: 20 Jun 2012 06:13
Last Modified: 20 Jun 2012 06:13
URI: http://eprints.umm.ac.id/id/eprint/8739