ARDIANSYAH, RUDY (2009) ANALISIS RE - LAYOUT PABRIK UNTUK MENINGKATKAN EFEKTIVITAS PROSES PRODUKSI Studi Kasus Section Production Bucket PC 300 Tiger Tooth PT. Katsuhiro Indonesia. Other thesis, University of Muhammadiyah Malang.
|
Text
ANALISIS_RE.pdf - Published Version Download (50kB) | Preview |
Abstract
Planning and arrangement arrange factory situation very is having an in with of process evacuation of materials, so that activity formation device and determination of materials stream trajectory can co-ordinate better. With determination of good materials stream trajectory will obtain;get evacuation of efficient and good materials, efficiency goodness to distance, time, and also efficiency to place or room. Target of analysis of Re-Layout this is to design to repeat to arrange facility situation [in] Section Welding Bucket PC. 300 Tiger Tooth PT. Katsushiro Indonesia, method the used [is] Method of Activity Relationship Chart ( ARC). Analyse research focused [by] [at] frequency, distance, and material momen of handling. With this method [of] distance transfer of lessened success materials till 30.6%, and production time can lessen equal to 9.66 %
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering > Department of Industrial Engineering (26201) |
Depositing User: | Anwar Jasin |
Date Deposited: | 21 Mar 2012 14:20 |
Last Modified: | 21 Mar 2012 14:20 |
URI : | http://eprints.umm.ac.id/id/eprint/862 |
Actions (login required)
![]() |
View Item |