STUDI PENJADWALAN WAKTU DAN ANGGARAN BIAYA (RAB) PADA PROYEK REHABILITASI GEDUNG FAKULTAS TEKNIK UNIVERSITAS BRAWIJAYA MALANG

WAHYUDI, LALU JAKA (2008) STUDI PENJADWALAN WAKTU DAN ANGGARAN BIAYA (RAB) PADA PROYEK REHABILITASI GEDUNG FAKULTAS TEKNIK UNIVERSITAS BRAWIJAYA MALANG. Other thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
STUDI_PENJADWALAN_WAKTU_DAN_ANGGARAN_BIAYA.pdf

Download (70kB) | Preview

Abstract

In developing a building needed a matured planning, because there are all kinds of activity in it is so that in executor wait so that can at ease and on schedule. To plan the budget, time and good human resource need correctness, in general project will get advantage if schedule can be made in an optimally. And optimal time that is the schedule compiled as short time which is possibly done to finish the project with the smallest budget. And the influence factor are ; finishing time, generalization human resource and curve form - S wanted. At final step got conclusion of finishing time of project that is 261 day / 10 months ( 22 Februari 2006 - 27 December 2006 ) with total budget Rp. 5,409,075,565.68.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Department of Civil Engineering
Depositing User: Rayi Tegar Pamungkas
Date Deposited: 09 Jun 2012 02:42
Last Modified: 09 Jun 2012 02:42
URI: http://eprints.umm.ac.id/id/eprint/6887

Actions (login required)

View Item View Item