UMM Institutional Repository

PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE NAWAZ, ENSCORE DANHAM(NEH) UNTUK MENGURANGI KETERLAMBATAN (TARDINESS)(Studi KasusPabrik ShuttlecockKendedes Malang)

Ashrofi, Miftah Yusron (2019) PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE NAWAZ, ENSCORE DANHAM(NEH) UNTUK MENGURANGI KETERLAMBATAN (TARDINESS)(Studi KasusPabrik ShuttlecockKendedes Malang). Bachelors Degree (S1) thesis, University of Muhammadiyah Malang.

[img]
Preview
Text
PENDAHULUAN.pdf

Download (3MB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (209kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (353kB) | Preview
[img]
Preview
Text
BAB III.pdf

Download (215kB) | Preview
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (664kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (112kB) | Request a copy
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (88kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (886kB) | Request a copy
[img] Text
POSTER.pdf
Restricted to Registered users only

Download (283kB) | Request a copy

Abstract

Kendedes shuttlecock company is a company engaged in the manufacture of sports products such as shuttlecocks. To do the scheduling it still uses the FCFS (first come first serve) method in the order in which the order is executed. Less than optimal production scheduling results in some orders experiencing delays and being unable to meet the time limit set by the consumer. This problem can be overcome by alternative production scheduling methods using the Nawaz, Enscore, Ham (NEH) method with priority Earliest Due Date (EDD) to reduce tardiness so that delays can be minimized and the deadline that has been set can be met. The results of the Nawaz, Enscore, Ham method can reduce delays by 51% of the total delays with the current company method.

Item Type: Thesis (Bachelors Degree (S1))
Student ID: 201210140311117
Thesis Advisors: Annisa Kesy Garside (0704107401), Dana Marsetiya Utama (0730038601)
Keywords: Scheduling, Job, FCFS, NEH, NEH-EDD, Tardiness
Subjects: H Social Sciences > HD Industries. Land use. Labor
L Education > L Education (General)
T Technology > T Technology (General)
Divisions: Faculty of Engineering > Department of Industrial Engineering (26201)
Depositing User: 201210140311117
Date Deposited: 04 Oct 2019 07:11
Last Modified: 04 Oct 2019 07:11
URI : http://eprints.umm.ac.id/id/eprint/53710

Actions (login required)

View Item View Item
UMM Official

© 2008 UMM Library. All Rights Reserved.
Jl. Raya Tlogomas No 246 Malang East Java Indonesia - Phone +62341464318 ext. 150, 151 - Fax +62341464101
E-Mail : infopus[at]umm.ac.id - Website : http://lib.umm.ac.id - Online Catalog : http://laser.umm.ac.id - Repository : http://eprints.umm.ac.id

Web Analytics

UMM Institutional Repository is powered by :
EPrints Logo